Revision history of "Increase transport accessibility of Tarnów economic activity zones with improved transit traffic parameters in the Tarnowskie subregion" (Q113011)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5703:57, 11 October 2024DG Regio talk contribs 88,588 bytes −102 Set a claim value: summary (P836): C.E.U. Tranquilo a partir da intersecção de ul. Krzyska e tranquilo e que termina antes da intersecção com al. Sandy, inclui a duração total do tempo. 854,5 m. Finalidade dos edifícios abrangidos pelo projeto, incluindo a extensão da estrada, na esquina: Extensão da ul. Tranquilo em T. para a secção transversal bidirecional 2x2; extensão da secção transversal ul. Krzyska e tranquilo com sinal de luz; construção de sistemas de drenagem rodoviária; re...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 13:1113:11, 2 March 2023DG Regio talk contribs 86,293 bytes +1,886 Changed label, description and/or aliases in lv, it, ro, fr, sv, da, sk, ga, hu, hr, fi, et, el, es, sl, cs, bg, nl, lt, de, pt, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4615:46, 2 July 2022DG Regio talk contribs 82,288 bytes +52,978 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1520:15, 1 December 2021DG Regio talk contribs 17,268 bytes +2,909 Created claim: summary (P836): Odc. st. Calme à partir de l’intersection de ul. Krzyska et Spokojna et se terminant avant l’intersection avec al. Sableux, y compris la longueur totale 854,5 m. L’intention des bâtiments couverts par le projet, y compris l’extension de la route, à proximité de l’extension de l’ul. Silencieux en T. pour section transversale 2x2; extension. Krzyska et Spokojna ainsi qu’un signal lumineux; construction d’un drainage routier; reconstruction et démo...
  • curprev 20:1520:15, 1 December 2021DG Regio talk contribs 14,359 bytes +240 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:5511:55, 20 October 2020DG Regio talk contribs 14,560 bytes +198 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5511:55, 20 October 2020DG Regio talk contribs 14,362 bytes −222 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5511:55, 20 October 2020DG Regio talk contribs 14,584 bytes +2,716 Created claim: summary (P836): C.E.U. Tranquil beginning at the intersection of ul. Krzyska and tranquil and ending before the intersection with al. Sandy, includes the total length of time. 854.5 m. Purpose of the buildings covered by the project, including the extension of the road, in the corner: extension of ul. Tranquil in T. for two-way cross-section 2x2; extension of the cross section ul. Krzyska and tranquil with light signal; road drainage construction; refurbishment...
  • curprev 11:5511:55, 20 October 2020DG Regio talk contribs 11,868 bytes −1,317 Removed claim: summary (P836): Doc. ul. Calm, starting from a junction. Krzyzska and Sune and ending at the intersection with al. They comprise a total of less than 5 years old. 854.5 m. Calm T to the cross section of dual carriageways 2x2; ul. ul. ul. Construction and demolition of the mains; reconstruction and dismantling of the mains. Tarnowskie Water Supply and wrecking of water mains. Road. construction and construction of a network and construction of networks and off...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2108:21, 10 March 2020DG Regio talk contribs 11,901 bytes +1,317 Created claim: summary (P836): Doc. ul. Calm, starting from a junction. Krzyzska and Sune and ending at the intersection with al. They comprise a total of less than 5 years old. 854.5 m. Calm T to the cross section of dual carriageways 2x2; ul. ul. ul. Construction and demolition of the mains; reconstruction and dismantling of the mains. Tarnowskie Water Supply and wrecking of water mains. Road. construction and construction of a network and construction of networks and offic...

24 February 2020

18 February 2020

31 January 2020

14 January 2020