Revision history of "Extension of the district road connecting the commune of Świątniki Górne with the TEN-T network – stage I" (Q112998)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 79,067 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 79,067 bytes +72 Set a claim value: summary (P836): Foi projetado para expandir a junção de três entradas existente na junção de uma rotunda. Foi concebida uma pequena rotunda com um diâmetro externo de 26 m DZW. A estrada circular tem uma largura de 5,0 m e uma rotunda circular de 3,0 m. As entradas reconstruídas, marcadas de acordo com direções geográficas como S, N e E, foram geométrica e verticalmente ligadas ao ordenamento do território existente e à rotunda de projeto. Nas entradas, as entradas...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 13:1113:11, 2 March 2023DG Regio talk contribs 76,598 bytes −1,625 Changed label, description and/or aliases in fr, it, da, bg, sk, cs, et, ga, fi, pt, es, el, de, mt, nl, hr, lt, hu, sl, lv, ro, sv, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 13:0213:02, 27 July 2022DG Regio talk contribs 76,117 bytes +49,049 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1520:15, 1 December 2021DG Regio talk contribs 16,266 bytes +2,663 Created claim: summary (P836): L’extension de l’intersection existante à trois entrées jusqu’à l’intersection du rond-point a été conçue. Un petit rond-point d’un diamètre extérieur de 26 m est conçu. La route du rond-point mesure 5,0 m de large et l’anneau rond-point de 3,0 m de large. Les entrées reconstruites, marquées selon les directions géographiques comme S, N et E, étaient géométriquement et élevées au développement des terres existantes et au rond-point prévu. Sur le...
  • curprev 20:1520:15, 1 December 2021DG Regio talk contribs 13,603 bytes +165 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 13,879 bytes +172 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 13,707 bytes −172 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 13,879 bytes +2,467 Created claim: summary (P836): It was designed to expand the existing three-intake junction at the junction of a roundabout. A small roundabout with an external diameter of DZW 26 m has been designed. The roundabout roadway has a width of 5.0 m and a ring roundabout 3.0 m. Reconstructed inlets, marked according to geographical directions as S, N and E, have been geometrically and vertically linked to the existing land development and to the design roundabout. At the inlets, t...
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 11,412 bytes −1,961 Removed claim: summary (P836): It is designed to extend the existing intersection of the three inlet to the intersection of the roundabout. Small drones have been designed with an external diameter of 26 m. The carriageway shall have a width of 5.0 m and a roundabout at 3.0 m. Retrofitted inlets which are marked in accordance with the geographical guidelines as S, N and E, have been geometrically and with a height of descent into existing land use and to the proposed rounda...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2008:20, 10 March 2020DG Regio talk contribs 12,089 bytes +1,961 Created claim: summary (P836): It is designed to extend the existing intersection of the three inlet to the intersection of the roundabout. Small drones have been designed with an external diameter of 26 m. The carriageway shall have a width of 5.0 m and a roundabout at 3.0 m. Retrofitted inlets which are marked in accordance with the geographical guidelines as S, N and E, have been geometrically and with a height of descent into existing land use and to the proposed roundabo...

24 February 2020

18 February 2020

31 January 2020

14 January 2020