Revision history of "Extension of ul. Myślenicka in Kraków" (Q112993)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1518:15, 9 October 2024DG Regio talk contribs 90,377 bytes +105 Set a claim value: summary (P836): O projeto inclui a extensão da ul. Tem um comprimento de cerca de 2,375 km desde a rotunda na saída da autoestrada A-4 até à intersecção com as ruas Niewodniczański e Krzyżański, juntamente com as infraestruturas de acompanhamento, bem como a promoção do projeto. O âmbito pormenorizado das obras de construção a realizar inclui: — ampliação, construção e reconstrução de estradas e calçadas, bem como reconstrução de intersecções ul. Myślenicka com rua...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 87,875 bytes −2,496 Changed label, description and/or aliases in da, it, sk, cs, lv, hr, fr, fi, ro, pt, lt, hu, et, ga, nl, sl, el, sv, bg, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4615:46, 2 July 2022DG Regio talk contribs 88,273 bytes +58,072 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1520:15, 1 December 2021DG Regio talk contribs 17,625 bytes +3,102 Created claim: summary (P836): Le projet comprend l’extension de l’ul. Myślenicka sur une section d’env. 2,375 km du rond-point à la sortie de l’autoroute A-4 jusqu’à la jonction avec les rues Niewodniczańskiego et Krzyżański, ainsi que l’infrastructure qui l’accompagne, ainsi que la promotion du projet. Le champ d’application détaillé des travaux à réaliser comprend: — extension, construction et reconstruction des chaussées et des chaussées avec reconstruction des intersecti...
  • curprev 20:1520:15, 1 December 2021DG Regio talk contribs 14,523 bytes +103 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 14,861 bytes +100 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 14,761 bytes −98 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 14,859 bytes +3,120 Created claim: summary (P836): The project includes the extension of ul. It has a length of approx. 2.375 km from the roundabout at the exit of the A-4 motorway to the intersection with Niewodniczański and Krzyżański streets along with accompanying infrastructure, as well as the promotion of the project. The detailed scope of the construction works to be carried out includes: — extension, construction and reconstruction of roads and sidewalks along with the reconstruction of...
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 11,739 bytes −2,569 Removed claim: summary (P836): The project consists of an extension of ul. Myślanicka over the length of ca. 2.375 km from the roundabout at the A-4 motorway junction to the intersection with the Independent Street and Krzyżański streets and associated infrastructure, as well as the promotion of the project. The detailed scope of the works to be carried out shall be as follows: Extension, construction and upgrading of roads and pavements with the upgrading of intersections...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:2008:20, 10 March 2020DG Regio talk contribs 13,023 bytes +2,569 Created claim: summary (P836): The project consists of an extension of ul. Myślanicka over the length of ca. 2.375 km from the roundabout at the A-4 motorway junction to the intersection with the Independent Street and Krzyżański streets and associated infrastructure, as well as the promotion of the project. The detailed scope of the works to be carried out shall be as follows: Extension, construction and upgrading of roads and pavements with the upgrading of intersections ul...

24 February 2020

18 February 2020

31 January 2020

14 January 2020