Revision history of "Expansion of DW 948 Oświęcim-Kęty and DW 949 Brzeszcze – Osiek" (Q112992)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 88,566 bytes −4 Changed label, description and/or aliases in pt
  • curprev 06:1606:16, 9 October 2024DG Regio talk contribs 88,570 bytes +11 Set a claim value: summary (P836): O projeto tem por objeto a elaboração da documentação do projeto, bem como a obtenção do consentimento da autoridade competente para a realização dos trabalhos com base na regulamentação aplicável e a execução dos trabalhos de construção. Os trabalhos de construção abrangidos pelo projeto serão realizados com base em duas tarefas da fase:A fase de tarefas I inclui: a ampliação da DW 948, sob a forma de estradas da classe G, estradas unidirecionais,...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

27 July 2022

  • curprev 13:0213:02, 27 July 2022DG Regio talk contribs 83,881 bytes +54,021 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1520:15, 1 December 2021DG Regio talk contribs 17,383 bytes +3,137 Created claim: summary (P836): L’objet du projet est de préparer la documentation du projet et d’obtenir l’autorisation de l’autorité compétente pour la réalisation des travaux sur la base de la réglementation applicable et l’exécution des travaux de construction. Les travaux de construction couverts par le projet seront réalisés sur la base de deux zadaniaetapy:ZadanieEtap Je comprend: extension du DW 948, en tant que routes de classe G, chaussée unique, 2 voies et reconstru...
  • curprev 20:1520:15, 1 December 2021DG Regio talk contribs 14,246 bytes +125 Changed label, description and/or aliases in fr: translated_label

26 December 2020

29 October 2020

20 October 2020

  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 14,568 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 14,440 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 14,566 bytes +2,848 Created claim: summary (P836): The object of the project is the task of drawing up project documentation together with obtaining the consent of the competent authority to carry out works on the basis of applicable regulations and execution of construction works.The construction works covered by the project will be carried out on the basis of two tasks of the stage:TaskStage I includes: the extension of DW 948, as G-class roads, one-way, 2pass roads and reconstruction of walkw...
  • curprev 11:5411:54, 20 October 2020DG Regio talk contribs 11,718 bytes −2,349 Removed claim: summary (P836): The project involves the drafting of project documentation with the approval of the competent authority to carry out works on the basis of the rules in force and construction of construction works. the project works will be carried out on the basis of two phases: extension of DW 948, as a class G, single-carriageway, 2lane and re-construction of pavements and cycle paths, upgrading junctions with lateral roads on the roundabout, reinforcing ro...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1408:14, 10 March 2020DG Regio talk contribs 12,777 bytes +2,349 Created claim: summary (P836): The project involves the drafting of project documentation with the approval of the competent authority to carry out works on the basis of the rules in force and construction of construction works. the project works will be carried out on the basis of two phases: extension of DW 948, as a class G, single-carriageway, 2lane and re-construction of pavements and cycle paths, upgrading junctions with lateral roads on the roundabout, reinforcing road...

24 February 2020

18 February 2020

31 January 2020

14 January 2020