Revision history of "Expansion DW 973 Żabno – Kozłów" (Q112975)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1518:15, 9 October 2024DG Regio talk contribs 81,251 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:1518:15, 9 October 2024DG Regio talk contribs 81,252 bytes +151 Set a claim value: summary (P836): O objetivo do projeto é a intenção de: redigir a documentação de projeto juntamente com a obtenção da decisão ZRID com a cláusula de executoriedade imediata ou o consentimento da autoridade competente para realizar os trabalhos e quaisquer outras decisões administrativas, disposições e pareceres necessários para realizar a tarefa de investimento com base na regulamentação aplicável, a execução dos trabalhos de construção juntamente com a infraestrut...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 79,838 bytes −2,515 Changed label, description and/or aliases in it, da, sk, de, cs, lv, pt, lt, fi, es, hr, ro, fr, bg, et, hu, sl, ga, nl, mt, el, sv, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 13:0213:02, 27 July 2022DG Regio talk contribs 78,624 bytes +51,042 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1420:14, 1 December 2021DG Regio talk contribs 16,511 bytes +2,763 Created claim: summary (P836): L’objectif du projet est de: la préparation de la documentation de conception ainsi que l’obtention de la décision du ZRID avec clause de force exécutoire immédiate ou le consentement de l’autorité compétente pour l’exécution des travaux et toute autre décision administrative, dispositions et avis nécessaires pour mener à bien la tâche d’investissement sur la base des règlements applicables, l’exécution des travaux de construction avec l’infrast...
  • curprev 20:1420:14, 1 December 2021DG Regio talk contribs 13,748 bytes +99 Changed label, description and/or aliases in fr: translated_label

26 December 2020

29 October 2020

20 October 2020

  • curprev 11:5311:53, 20 October 2020DG Regio talk contribs 14,096 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5311:53, 20 October 2020DG Regio talk contribs 13,999 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5311:53, 20 October 2020DG Regio talk contribs 14,101 bytes +2,657 Created claim: summary (P836): The object of the Project is the intention of: drafting the design documentation together with obtaining the ZRID decision with the clause of immediate enforceability or consent of the competent authority to carry out the works and any other administrative decisions, arrangements and opinions necessary to carry out the investment task on the basis of the applicable regulations, the execution of the construction works together with the necessary...
  • curprev 11:5311:53, 20 October 2020DG Regio talk contribs 11,444 bytes −2,048 Removed claim: summary (P836): The aim of the project is to: the preparation of project documentation, together with a decision of the ZRID with the clause of immediate enforceability and/or approval of the competent authority to carry out works and any other administrative decisions, arrangements and opinions required to complete the investment task on the basis of the applicable provisions, the execution of the works, together with the necessary accompanying infrastructur...

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1408:14, 10 March 2020DG Regio talk contribs 12,200 bytes +2,048 Created claim: summary (P836): The aim of the project is to: the preparation of project documentation, together with a decision of the ZRID with the clause of immediate enforceability and/or approval of the competent authority to carry out works and any other administrative decisions, arrangements and opinions required to complete the investment task on the basis of the applicable provisions, the execution of the works, together with the necessary accompanying infrastructure,...

24 February 2020

18 February 2020

31 January 2020

14 January 2020