Revision history of "Cycling paths and tourist point on the Gulf of Zakliczyńska" (Q112953)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1518:15, 9 October 2024DG Regio talk contribs 82,676 bytes +8 Changed label, description and/or aliases in pt
  • curprev 18:1518:15, 9 October 2024DG Regio talk contribs 82,668 bytes +87 Set a claim value: summary (P836): Ciclovias e ponto turístico sobre a Baía de ZakliczyńskaConstrução 2 passadiços arborizados em aço, juntamente com a fortificação de encostas e cursos de água, bem como o desenvolvimento do terreno ao longo da rota n.o 4B; Construção de uma estrada pedestre e renovação da estrada municipal existente, juntamente com a construção de um ponto turístico com uma paragem mundial, uma plataforma de vigia, escadas de campo e um pequeno percurso arquitetónic...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 79,407 bytes −1,078 Changed label, description and/or aliases in it, da, lv, sk, et, cs, fi, hr, sv, nl, bg, ro, de, fr, sl, lt, es, pt, el, ga, hu, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4515:45, 2 July 2022DG Regio talk contribs 78,370 bytes +50,482 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 16,562 bytes +2,785 Created claim: summary (P836): Pistes cyclables et point touristique à la baie de ZakliczyńskaConstruction de 2 passerelles en bois d’acier avec le renforcement des pentes et du cours d’eau et avec le développement de la zone le long de la route no 4B un sentier pédestre; construction d’une voie piétonne et la reconstruction d’une route municipale existante, ainsi que la construction d’un point touristique avec un abri, une plate-forme d’observation, un escalier de terrain et...
  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 13,777 bytes +127 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 14,089 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 13,970 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 14,093 bytes +2,594 Created claim: summary (P836): Cycle paths and tourist point over the Zakliczyńska BayConstruction 2 steel-wooded footbridges along with fortification of slopes and watercourses, as well as the development of the terrain along the route No. 4B hiking track; Construction of a walking road and renovation of the existing municipal road together with the construction of a tourist point with a world stop, a lookout platform, field stairs and a small architecture route No. 5; Const...
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 11,499 bytes −2,189 Removed claim: summary (P836): The bicycle paths and the tourist point above the Gulf of Zakeliczyt Construction of 2 laying steel frames together with the consolidation of the turbot and the watercourse and to the management of the site within route No 4B (walking string); construction of the roundabout road and the renovation of the existing municipal road, along with the construction of a tourist point with a stop, visibility, field stairs and small-scale architecture, r...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1408:14, 10 March 2020DG Regio talk contribs 12,396 bytes +2,189 Created claim: summary (P836): The bicycle paths and the tourist point above the Gulf of Zakeliczyt Construction of 2 laying steel frames together with the consolidation of the turbot and the watercourse and to the management of the site within route No 4B (walking string); construction of the roundabout road and the renovation of the existing municipal road, along with the construction of a tourist point with a stop, visibility, field stairs and small-scale architecture, rou...

24 February 2020

18 February 2020

31 January 2020

14 January 2020