Revision history of "Modernisation of the treatment base in the northern wing in the sanatorium of NEW MINERAL SALW in Krynica-Zdrój together with replacement of connections and renovation of the internal road" (Q112932)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 94,150 bytes +11 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 94,139 bytes +28 Set a claim value: summary (P836): O projeto inclui a modernização da base de tratamento no rés-do-chão da ala norte do Sanatório Mineral Nowe Łazienki, a reconstrução e renovação do primeiro andar da ala norte do edifício, bem como a substituição das ligações de água e esgotos ao edifício, juntamente com a renovação das estradas internas e a criação de lugares de estacionamento nas instalações. A conversão da instalação de tratamento destina-se a adaptar as instalações existentes ao...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 23:2623:26, 2 March 2023DG Regio talk contribs 90,937 bytes +306 Changed label, description and/or aliases in it, sk, fi, bg, de, lv, et, cs, pt, ro, fr, ga, sl, es, hu, sv, el, mt, lt, nl, hr, da, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4515:45, 2 July 2022DG Regio talk contribs 88,514 bytes +57,633 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0620:06, 1 December 2021DG Regio talk contribs 17,845 bytes +3,135 Created claim: summary (P836): Le projet comprend la modernisation de la base de traitement au rez-de-chaussée dans l’aile nord du Sanatorium Nowe Łazienki Mineral, la reconstruction et la rénovation du premier étage de l’aile nord du bâtiment, le remplacement des raccordements d’eau et d’assainissement au bâtiment ainsi que la rénovation des routes intérieures et la création d’espaces de stationnement sur le site. La reconstruction de la station d’épuration vise à adapter le...
  • curprev 20:0620:06, 1 December 2021DG Regio talk contribs 14,710 bytes +249 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:3314:33, 20 October 2020DG Regio talk contribs 14,900 bytes +249 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3314:33, 20 October 2020DG Regio talk contribs 14,651 bytes −235 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3314:33, 20 October 2020DG Regio talk contribs 14,886 bytes +2,872 Created claim: summary (P836): The project includes modernisation of the treatment base on the ground floor in the northern wing of the Sanatorium Nowe Mineral Łazienki, reconstruction and renovation of the first floor of the north wing of the building, as well as replacement of water and sewage connections to the building together with renovation of internal roads and the creation of parking spaces on the premises. The conversion of the treatment facility is aimed at adaptin...
  • curprev 14:3314:33, 20 October 2020DG Regio talk contribs 12,014 bytes −2,348 Removed claim: summary (P836): The project includes the modernisation of the treatment base on the ground floor in the Northern wing of the Sanatorium, the New Deal Mineral Building, the reconstruction and renovation of the first floor of the northern wing of the building and the replacement of water and sewage connections to the building with the renovation of the internal roads and the creation of parking areas on the site. The modification of the treatment plant is inten...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1308:13, 10 March 2020DG Regio talk contribs 13,079 bytes +2,348 Created claim: summary (P836): The project includes the modernisation of the treatment base on the ground floor in the Northern wing of the Sanatorium, the New Deal Mineral Building, the reconstruction and renovation of the first floor of the northern wing of the building and the replacement of water and sewage connections to the building with the renovation of the internal roads and the creation of parking areas on the site. The modification of the treatment plant is intende...

24 February 2020

18 February 2020

31 January 2020

14 January 2020