Revision history of "Tourism and Economic Activity Zone, which is the integration of Muszyna centre with the spa zone" (Q112909)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 62,536 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 62,536 bytes +21 Set a claim value: summary (P836): O projeto realizará as seguintes tarefas: Zad. 1.Desenvolvimento da documentação necessária, incluindo: Plano de Desenvolvimento de Saúde Muszyna, desenvolvimento de documentação técnica de projectos de construção em conjunto com estudos da indústria para ul. Kity, Short, Krzywa, Wąska, Roland e um local de design-custo para umas férias localizadas em ul. Roland e análise financeira, económica e de risco. É o rabo. 2. trabalho na Zona de Actividade...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

3 March 2023

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:5812:58, 27 July 2022DG Regio talk contribs 57,362 bytes +35,588 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0620:06, 1 December 2021DG Regio talk contribs 14,024 bytes +1,828 Created claim: summary (P836): Le projet sera mis en œuvre à l’adresse suivante: zadania:Zad. 1.Élaboration de la documentation nécessaire, qui comprend: Muszyna Spa Plan de développement, documentation technique pour le développement de projets de construction ainsi que des études industrielles pour ul. Kity, Short, Krzywa, Wąska, Roland et un design et coût pour un lieu de vacances situé à ul. Roland et analyse financière, économique et des risques. AWW. 2. Travail dans la...
  • curprev 20:0620:06, 1 December 2021DG Regio talk contribs 12,196 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:3214:32, 20 October 2020DG Regio talk contribs 12,464 bytes +155 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3214:32, 20 October 2020DG Regio talk contribs 12,309 bytes −157 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3214:32, 20 October 2020DG Regio talk contribs 12,466 bytes +1,704 Created claim: summary (P836): The project will carry out the following tasks: Zad. 1.development of the necessary documentation, including: Muszyna Health Development Plan, technical documentation development of construction projects together with industry studies for ul. Kity, Short, Krzywa, Wąska, Roland and a design-cost place for a vacation located at ul. Roland and financial, economic and risk analysis. It’s the ass. 2. work in the Economic and Tourism Activity Zone, wh...
  • curprev 14:3214:32, 20 October 2020DG Regio talk contribs 10,762 bytes −1,174 Removed claim: summary (P836): The project will carry out the following tasks: 1.developing the necessary documentation to include: Development plan at Muszyna Development, technical documentation for construction of construction projects together with industry studies for ul. Kiosk, Queen, Krzywa, Roland and Moreland for a resting place at ul. Roland and financial, economic and risk analysis. Task 2. work on the European Tourism Economic Zone, consisting of activities rela...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1308:13, 10 March 2020DG Regio talk contribs 10,646 bytes +1,174 Created claim: summary (P836): The project will carry out the following tasks: 1.developing the necessary documentation to include: Development plan at Muszyna Development, technical documentation for construction of construction projects together with industry studies for ul. Kiosk, Queen, Krzywa, Roland and Moreland for a resting place at ul. Roland and financial, economic and risk analysis. Task 2. work on the European Tourism Economic Zone, consisting of activities relate...

24 February 2020

18 February 2020

31 January 2020

14 January 2020