Revision history of "Implementation of the Active Holiday Centre project, including cross-country and cross-country tracks" (Q112831)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:2016:20, 10 October 2024DG Regio talk contribs 76,185 bytes −14 Changed label, description and/or aliases in pt
  • curprev 16:2016:20, 10 October 2024DG Regio talk contribs 76,199 bytes −224 Set a claim value: summary (P836): O Centre for Active Holiday CAW inclui a construção de um projeto sistémico para a construção de vias transversais na sub-região de Sądecki nos seguintes municípios:Bobowa: 1 trilho de navegação com um comprimento de 2 523 km Łącko: 1 ciclovia de travessia do país com uma extensão de 2,716 km e reconstrução de uma ponte pedonal na ribeira de águas negras em ŁąckoStary Sącz: 3 rotas turísticas com uma extensão total de 5,452 km: percurso de ciclismo...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 73,249 bytes +4,583 Changed label, description and/or aliases in lv, it, da, sk, fi, ro, hu, fr, el, pt, et, ga, sv, lt, sl, hr, nl, de, mt, es, cs, bg, and other parts

3 December 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4315:43, 2 July 2022DG Regio talk contribs 64,130 bytes +39,507 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0120:01, 1 December 2021DG Regio talk contribs 15,086 bytes +2,185 Created claim: summary (P836): Le Centre de loisirs actifs de la CAW consiste en la construction d’un projet de système dans le cadre duquel des itinéraires intercycles seront construits dans la sous-région de Sądecki, à l’adresse suivante: gminach:Bobowa: 1 parcours de ski de fond de 2,523 kmŁącko: 1 piste cyclable de fond d’une longueur de 2,716 km et reconstruction de la passerelle sur le ruisseau Czarna Woda dans la ville de ŁąckoStary Sącz: 3 itinéraires touristiques d’u...
  • curprev 20:0120:01, 1 December 2021DG Regio talk contribs 12,901 bytes +173 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 13,167 bytes +161 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 13,006 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 13,158 bytes +1,962 Created claim: summary (P836): The Centre for Active Holiday CAW includes the construction of a systemic project to build cross-country tracks in the Sądecki subregion in the following municipalities:Bobowa: 1 cross-country trail with a length of 2,523 kmŁącko: 1 cross-country cycling route with a length of 2.716 km and Reconstruction of a footbridge on the Black Water stream in ŁąckoStary Sącz: 3 tourist routes with a total length of 5.452 km: cross-country cycling route No....
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 11,196 bytes −1,695 Removed claim: summary (P836): The CAW Active Centre comprises the construction of a systemic project for the construction of the running gear in the Sąderki subregion in the following municipalities: bobowa: 1 cross-country route 2,523 kmŁącko: 1 a 2.716 km cycle with a km long cycle, and the construction of a pedestrian overpass through Czarna Woda, in m. ŁąckoStary Sącz: 3 tourist routes with a total length of 5.452 km: a cycle run of 2139mb on the route of existing fore...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1808:18, 10 March 2020DG Regio talk contribs 11,607 bytes +1,695 Created claim: summary (P836): The CAW Active Centre comprises the construction of a systemic project for the construction of the running gear in the Sąderki subregion in the following municipalities: bobowa: 1 cross-country route 2,523 kmŁącko: 1 a 2.716 km cycle with a km long cycle, and the construction of a pedestrian overpass through Czarna Woda, in m. ŁąckoStary Sącz: 3 tourist routes with a total length of 5.452 km: a cycle run of 2139mb on the route of existing forest...

24 February 2020

18 February 2020

31 January 2020

14 January 2020