Revision history of "Integrated tourist product of the Tarnów Subregion “Bicycle Routes of Foothills”." (Q112830)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 97,139 bytes +9 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 97,130 bytes −590 Set a claim value: summary (P836): O projeto tem por objeto a construção e modernização de ciclovias tendo em conta as infraestruturas associadas:1.G. BorzęcinTing e marcação de vias, infrastr. commodity.,2.G. Brzeskoconstrução de ciclovias, marcação, compra e montagem de infrastr. adicional,3.G. Dębnoconstrução de bicicletas, construção de vias., marcação e marcação de trilhos,4.P. Brest construção do parque de estacionamento, espaços para ciclistas, construção de um ginásio externo...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 93,824 bytes +9,735 Changed label, description and/or aliases in it, da, lv, sk, bg, cs, fr, pt, hu, fi, mt, ro, hr, ga, sv, el, et, lt, nl, es, de, sl, and other parts

3 December 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4315:43, 2 July 2022DG Regio talk contribs 77,534 bytes +48,008 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0120:01, 1 December 2021DG Regio talk contribs 17,166 bytes +3,233 Created claim: summary (P836): L’objet du projet est la construction et la modernisation de pistes cyclables, y compris l’infrastructure de towarzyszącej:1.G. Borzęcindirection et marquage des itinéraires, infrastr. goodsz.,2.G. Brzesko construction d’une piste cyclable, signalisation, achat et installation d’infrastructures supplémentaires,3.G. Dębnoconstruction de pistes cyclables., délimitation et marquage des sentiers, 4.P. Brestbuilding of parking, emplacements pour les...
  • curprev 20:0120:01, 1 December 2021DG Regio talk contribs 13,933 bytes +158 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 14,214 bytes +145 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 14,069 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 14,201 bytes +2,433 Created claim: summary (P836): The object of the project is the construction and modernisation of cycle routes taking into account the associated infrastructure:1.G. BorzęcinTing and marking of routes, infrastr. commodity.,2.G. Brzeskoconstruction of cycle path, marking, purchase and assembly of infrastr. additional,3.G. Dębnoconstruction of bicycles, construction of routes., marking and marking of trails,4.P. Brest construction of the parking lot, spaces for cyclists, constr...
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 11,768 bytes −1,620 Removed claim: summary (P836): The object of the project is the construction and modernisation of the cycle routes, including the infrastructure towarzyszącej:1.G. The City of Tarnovation of the bicycle., marking, rebuilding of the existing infrastructure., construction of the MOR, construction of stop-spots. all planned cycle routes are in conformity with the Design Manual and are consistent with the network of main cycle routes included in the construction concept. detail...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1808:18, 10 March 2020DG Regio talk contribs 12,099 bytes +1,620 Created claim: summary (P836): The object of the project is the construction and modernisation of the cycle routes, including the infrastructure towarzyszącej:1.G. The City of Tarnovation of the bicycle., marking, rebuilding of the existing infrastructure., construction of the MOR, construction of stop-spots. all planned cycle routes are in conformity with the Design Manual and are consistent with the network of main cycle routes included in the construction concept. details...

24 February 2020

18 February 2020

31 January 2020

14 January 2020