Revision history of "Turisticus – construction of an integrated network of tourist routes in Bochni" (Q112829)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1618:16, 9 October 2024DG Regio talk contribs 84,816 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:1618:16, 9 October 2024DG Regio talk contribs 84,817 bytes −108 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma rede integrada de ciclovias, percursos pedestres e pedestres na Bochnia, em ligação com o autocarro europeu de bicicletas EuroVelo 4. A execução real do investimento inclui: 1 Construção de um ciclo de 0,75 km de comprimento, juntamente com o desenvolvimento do parque infantil adjacente, ginásio2 Entrega e montagem de infraestruturas associadas e pequenas instalações de arquitetura 3 Iluminação e videovig...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4315:43, 2 July 2022DG Regio talk contribs 79,987 bytes +50,718 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0120:01, 1 December 2021DG Regio talk contribs 17,087 bytes +3,103 Created claim: summary (P836): L’objet du projet est la construction d’un réseau intégré de randonnées pédestres, de randonnées et de randonnées pédestres à Bochnia, reliée au bus cycliste européen EuroVelo 4. La mise en œuvre effective de l’investissement comprend:1 Construction d’une piste cyclable de 0,75 km de long avec le développement de l’aire de jeux adjacente, salle de gym2 Livraison et installation d’infrastructures d’accompagnement et de petites installations d’arc...
  • curprev 20:0120:01, 1 December 2021DG Regio talk contribs 13,984 bytes +152 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 14,271 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 14,132 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 14,280 bytes +2,576 Created claim: summary (P836): The subject of the project is the construction of an integrated network of cycling, hiking and walking routes in Bochnia connected with the European bicycle bus EuroVelo 4. The real implementation of the investment includes:1 Construction of 0.75 km long cycle cycle along with the development of the adjacent playground, gym2 Delivery and assembly of associated infrastructure and small architecture facilities 3 Lighting and video monitoring of cy...
  • curprev 14:2714:27, 20 October 2020DG Regio talk contribs 11,704 bytes −2,115 Removed claim: summary (P836): The project aims at building an integrated network of cycle, pedestrian and bonded travel routes within the vicinity of the EuroVelo 4 cycle European rail network. The tangible implementation of the investment consists of: 1 Building a 0.75 km cycle of 4 km in length with the management of an adjacent ground floor area, up to 2 DoI and installation of supporting infrastructure and street furniture 3. construction and monitoring of a 26 km tour...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1808:18, 10 March 2020DG Regio talk contribs 12,537 bytes +2,115 Created claim: summary (P836): The project aims at building an integrated network of cycle, pedestrian and bonded travel routes within the vicinity of the EuroVelo 4 cycle European rail network. The tangible implementation of the investment consists of: 1 Building a 0.75 km cycle of 4 km in length with the management of an adjacent ground floor area, up to 2 DoI and installation of supporting infrastructure and street furniture 3. construction and monitoring of a 26 km tour o...

24 February 2020

18 February 2020

31 January 2020

14 January 2020