Revision history of "Reconstruction and expansion of the building at ul. Czech Republic in Limanowa for the needs of the Culture House with a showroom" (Q112806)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 76,853 bytes −1 Changed label, description and/or aliases in pt
  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 76,854 bytes +38 Set a claim value: summary (P836): O projeto foi projetado para reconstruir e expandir a sala de exposições, ampliando o público para 439 assentos. Etapa ampliada com a expansão de instalações de palco na forma de guarda-roupa, armazéns e instalações técnicas necessárias. Expansão do hall de entrada juntamente com o camarim e caixa registadora e nó sanitário. Uma adaptação da instalação foi concebida para as necessidades das pessoas com deficiência. O edifício também foi projetado pa...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4215:42, 2 July 2022DG Regio talk contribs 71,420 bytes +45,619 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 15,673 bytes +2,414 Created claim: summary (P836): Dans le cadre du projet, la reconstruction et l’extension de la salle d’exposition ont été conçues en élargissant le public à 439 places. Agrandir la scène avec le développement des installations de scène sous la forme de vestiaires, magazines et les installations techniques nécessaires. Extension du foyer avec vestiaire, caissier et nœud sanitaire. L’installation a été conçue pour répondre aux besoins des personnes handicapées. La thermomoderni...
  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 13,259 bytes +212 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:2614:26, 20 October 2020DG Regio talk contribs 13,486 bytes +189 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:2614:26, 20 October 2020DG Regio talk contribs 13,297 bytes −199 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:2614:26, 20 October 2020DG Regio talk contribs 13,496 bytes +2,245 Created claim: summary (P836): The project was designed to rebuild and expand the showroom by enlarging the audience to 439 seats. Enlarged stage with the expansion of stage facilities in the form of wardrobe, warehouses and necessary technical facilities. Expansion of the foyer along with the dressing room and cash register and sanitary knot. An adaptation of the facility was designed for the needs of people with disabilities. The building was also designed to modernise the...
  • curprev 14:2614:26, 20 October 2020DG Regio talk contribs 11,251 bytes −1,825 Removed claim: summary (P836): As part of the project, the refurbishment and expansion of the performing room were designed by increasing the audience of the audience to 439. Enlargement of the stage with the extension of stage facilities in the form of a suit, warehouse and necessary technical support. The development of the foyer with a cash and health point. The object is designed to adapt the object to the needs of persons with disabilities. The renovation of the buildi...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1808:18, 10 March 2020DG Regio talk contribs 11,787 bytes +1,825 Created claim: summary (P836): As part of the project, the refurbishment and expansion of the performing room were designed by increasing the audience of the audience to 439. Enlargement of the stage with the extension of stage facilities in the form of a suit, warehouse and necessary technical support. The development of the foyer with a cash and health point. The object is designed to adapt the object to the needs of persons with disabilities. The renovation of the building...

24 February 2020

18 February 2020

31 January 2020

14 January 2020