Revision history of "Extension and modernisation of the sewage treatment plant in Krościenek" (Q112707)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 76,238 bytes −3,012 Set a claim value: summary (P836): O âmbito material do projeto foi incluído no atual plano diretor, aprovado em setembro de 2017 no anexo do plano de gestão, que incluía a tarefa de expandir e modernizar a estação de tratamento de águas residuais de Krościenek nad Dunajec, que deverá estar concluída até ao final de 2020. Entre as soluções descritas no conceito, a seguinte variante é escolhida para garantir o funcionamento ideal da estação de tratamento modernizada com aumento da car...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3519:35, 2 March 2023DG Regio talk contribs 76,077 bytes +8,156 Changed label, description and/or aliases in lv, it, ro, da, sv, fr, ga, sk, hu, bg, fi, de, nl, sl, mt, et, el, es, hr, lt, cs, pt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4015:40, 2 July 2022DG Regio talk contribs 65,806 bytes +39,420 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 15,559 bytes +2,277 Created claim: summary (P836): Le champ d’application matériel du projet a été inclus dans l’actuel plan directeur approuvé en septembre 2017 en tant qu’annexe au PM, qui prévoyait l’extension et la modernisation de la station d’épuration des eaux usées de Krościenk nad Dunajec, qui devrait être achevée d’ici la fin de 2020. L’investissement est également inclus dans l’annexe 2 de V AKPOŚK. Parmi les solutions décrites dans le concept, l’option suivante a été choisie pour gar...
  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 13,282 bytes +144 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 13,579 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 13,446 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 13,586 bytes +1,952 Created claim: summary (P836): The project’s material scope was included in the current Master Plan approved in September 2017 in the annex to the MP included the task of expanding and modernising the sewage treatment plant in Krościenek nad Dunajec, which should be completed by the end of 2020. Among the solutions described in the concept, the following variant is chosen to ensure the optimal operation of the modernised treatment plant with increased load resulting from the...
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 11,634 bytes −1,853 Removed claim: summary (P836): The scope of the project was included in the current Master Plan approved in September 2017 in an annex to MP for the extension and modernisation of the wastewater treatment plant in the Dunajec Valley, which should be completed by the end of 2020. The investment is also included in Annex No 2 to V AKPOŚK.-The approach described in the concept was the following option to ensure optimal operation of the upgraded treatment plant at an increased...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0312:03, 9 March 2020DG Regio talk contribs 12,198 bytes +1,853 Created claim: summary (P836): The scope of the project was included in the current Master Plan approved in September 2017 in an annex to MP for the extension and modernisation of the wastewater treatment plant in the Dunajec Valley, which should be completed by the end of 2020. The investment is also included in Annex No 2 to V AKPOŚK.-The approach described in the concept was the following option to ensure optimal operation of the upgraded treatment plant at an increased bu...

24 February 2020

18 February 2020

31 January 2020

14 January 2020