Revision history of "Construction of sanitary gravitational and pressure drainage with sewers in the village: Bratucice – stage III, Dębina – stage III, beechków – stage IV, Dąbrówka – stage II" (Q112701)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3519:35, 2 March 2023DG Regio talk contribs 85,192 bytes +5,891 Changed label, description and/or aliases in it, da, sk, ga, et, fi, hr, de, el, bg, lv, sv, fr, pt, cs, es, nl, ro, hu, lt, sl, mt, and other parts

26 October 2022

21 October 2022

27 September 2022

27 July 2022

  • curprev 12:5112:51, 27 July 2022DG Regio talk contribs 77,187 bytes +48,229 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 May 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 16,936 bytes +2,850 Created claim: summary (P836): La mise en œuvre du projet comprend les tâches suivantes:1. Construction d’un système d’assainissement par gravité-pression avec égouts dans le village de: Bratucice Stage III, Dębin Stage III, Bulks Stage IV, Dąbrówka Stage II. Dans le cadre de la mise en œuvre de ce projet, un système serré de réseau d’égouts a été conçu à l’aide de tuyaux de gravité et de pression, assurant l’auto-égouttage et l’auto-aération de tous ses éléments de travail i...
  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 14,086 bytes +264 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 14,263 bytes +246 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 14,017 bytes −231 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 14,248 bytes +2,303 Created claim: summary (P836): The implementation of the project shall include the following tasks:1. Construction of sanitary gravitational pressure drainage with sewers in the village: Bratucice stage III, Dębina stage III, beeches stage IV, Dąbrówka stage II.As part of this project, a tight system of sewage network with the use of gravitational and pressure wires has been designed to ensure self-dehydration and self-airing of all its independently functioning components. T...
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 11,945 bytes −1,582 Removed claim: summary (P836): Implementation of the project involves the following tasks: 1. Construction of a gravitational sanitary sewerage system with sewage systems in the city of: Brituacice stage III, oak phase III, Bscholars stage IV, Dącnik Stage II.In the context of the implementation of this project, a clean sewage system system has been designed with gravity and pressure pipes ensuring self-drainage and self-venting of all its independent components. Main netwo...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0312:03, 9 March 2020DG Regio talk contribs 12,244 bytes +1,582 Created claim: summary (P836): Implementation of the project involves the following tasks: 1. Construction of a gravitational sanitary sewerage system with sewage systems in the city of: Brituacice stage III, oak phase III, Bscholars stage IV, Dącnik Stage II.In the context of the implementation of this project, a clean sewage system system has been designed with gravity and pressure pipes ensuring self-drainage and self-venting of all its independent components. Main network...

24 February 2020

18 February 2020

31 January 2020

14 January 2020