Revision history of "Reconstruction and extension of the waste water treatment plant in Bork with technical and accompanying infrastructure" (Q112693)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

27 September 2022

2 July 2022

  • curprev 15:4015:40, 2 July 2022DG Regio talk contribs 83,870 bytes +54,364 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 17,242 bytes +3,038 Created claim: summary (P836): La mise en œuvre comprend les tâches suivantes:1. Reconstruction et extension de la station d’épuration de Bork.La station d’épuration existante sera transformée en une station d’épuration mécanique biologique des eaux usées fonctionnant sur la base de boues activées, type SBR avec remplissage et vidange périodiques des réacteurs, réservoir tampon et stabilisation d’oxygène des boues dans une chambre séparée KTSO et déshydratation et hygiénisati...
  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 14,204 bytes +198 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,447 bytes +180 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,267 bytes −195 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,462 bytes +2,689 Created claim: summary (P836): Implementation shall include the following tasks:1. The existing sewage treatment plant will be converted into a mechanical biological sewage treatment plant based on active sludge, SBR type with periodic filling and draining of reactors, buffer tank and oxygen sediment stabilisation in a separate KTSO chamber and draining and hygienic deposits with burning lime, including: sink tank of transported waste water 5,00x5,00x2,00 m; a sewage pumping...
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 11,773 bytes −2,305 Removed claim: summary (P836): The implementation shall consist of the following tasks: 1. The upgrade and extension of the waste water treatment plant in Borku.Existing water treatment plant will be upgraded to a mechanical and biological sewage treatment plant based on activated sludge, SBR type with intermittent filling and emptying of reactors, buffer tank and aerobic stabilisation of sediments in a segregated KSO chamber, and drainage and hygienic sediment conditioning...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0312:03, 9 March 2020DG Regio talk contribs 12,788 bytes +2,305 Created claim: summary (P836): The implementation shall consist of the following tasks: 1. The upgrade and extension of the waste water treatment plant in Borku.Existing water treatment plant will be upgraded to a mechanical and biological sewage treatment plant based on activated sludge, SBR type with intermittent filling and emptying of reactors, buffer tank and aerobic stabilisation of sediments in a segregated KSO chamber, and drainage and hygienic sediment conditioning,...

24 February 2020

18 February 2020

31 January 2020

14 January 2020