Revision history of "Construction of sanitary sewage system in the Jabłonka agglomeration together with the extension of the sewage treatment plant" (Q112673)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 91,691 bytes +24 Changed label, description and/or aliases in pt
  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 91,667 bytes −24 Set a claim value: summary (P836): Como parte deste projeto, está prevista a construção de esgotos sanitários em conjuntos habitacionais: Cabana e Chyżnik 4,7 km de comprimento, juntamente com a estação de bombagem, incluindo a parte qualificada de 2,96 km,Parte não elegível: javali com um comprimento de 3,03 km, Jabłonka Bora com um comprimento de 1,51 km. Para alcançar plenamente os objetivos do projeto, é necessário expandir e modernizar a estação de tratamento de águas residuais...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3519:35, 2 March 2023DG Regio talk contribs 88,517 bytes +313 Changed label, description and/or aliases in lv, sk, it, da, ga, fr, lt, el, fi, et, ro, nl, cs, hr, pt, sv, sl, de, es, hu, bg, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:3915:39, 2 July 2022DG Regio talk contribs 86,092 bytes +56,217 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 17,435 bytes +3,024 Created claim: summary (P836): Dans le cadre de ce projet, il est prévu de construire un réseau d’assainissement dans les lotissements suivants: Cabane et Chyżnik 4,7 km de longueur avec station de pompage, y compris 2,96 km de partie qualifiée,Pièce inéligible: Sauvage 3,03 km de long, 1,51 km de long Jabłonka Bory. Afin d’atteindre pleinement les objectifs du projet, il est nécessaire d’étendre et de moderniser la station d’épuration des eaux usées de Jabłonka. En conséquen...
  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 14,411 bytes +216 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,636 bytes +189 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,447 bytes −189 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,636 bytes +2,799 Created claim: summary (P836): As part of this project, it is planned to build sanitary sewage on housing estates: Hut and Chyżnik 4,7 km long together with pumping station including 2,96 km qualified part,Ineligible part: Wild boar with a length of 3.03 km, Jabłonka Bora with a length of 1.51 km. To fully achieve the objectives of the project, it is necessary to expand and modernise the existing sewage treatment plant in Jabłonka. As a result, the average throughput will be...
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 11,837 bytes −2,192 Removed claim: summary (P836): The project involves the construction of a sanitary sewage system in settlements: Saffron and Chyżnik, with a length of 4.7 km including a 2.96 km qualified part, and a non-eligible part: 3.03 km of wild boar, 1.51 km long. For the full achievement of the objectives of the project it is necessary to expand and modernise the existing sewage treatment plant in Jabłonce. As a result, the average capacity of 680-3/1989/800/3/2586 will be increased...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0112:01, 9 March 2020DG Regio talk contribs 12,739 bytes +2,192 Created claim: summary (P836): The project involves the construction of a sanitary sewage system in settlements: Saffron and Chyżnik, with a length of 4.7 km including a 2.96 km qualified part, and a non-eligible part: 3.03 km of wild boar, 1.51 km long. For the full achievement of the objectives of the project it is necessary to expand and modernise the existing sewage treatment plant in Jabłonce. As a result, the average capacity of 680-3/1989/800/3/2586 will be increased....

24 February 2020

18 February 2020

31 January 2020

14 January 2020