Revision history of "Construction of the Municipal Waste Collection Point in Biecz" (Q112656)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 October 2022

27 July 2022

  • curprev 12:4912:49, 27 July 2022DG Regio talk contribs 77,444 bytes +49,750 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 16,549 bytes +2,828 Created claim: summary (P836): Le projet prévoit la construction d’un point de collecte séparé des déchets municipaux dans la ville de Biecz. Le projet peut logiquement être divisé en 3 étapes:1. Préparation de l’investissement, réalisé par l’élaboration d’un programme fonctionnel utilisable et l’analyse financière nécessaire à la soumission de la demande, réalisée et préparation du projet de construction.2. Réalisation de l’investissement consistant en l’aménagement des parc...
  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 13,721 bytes +125 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,037 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 13,915 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,040 bytes +2,566 Created claim: summary (P836): The project plans to build a separate collection point for municipal waste in the city of Biecz. The project can be logically divided into 3 stages:1. Preparation for the investment, carried out through the development of a functional-use programme and financial analysis necessary for the submission of an application, carried out and preparing a construction project.2. Carrying out an investment involving the development of plots 24906, 24909 in...
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 11,474 bytes −1,923 Removed claim: summary (P836): The project plans to build a separate collection point for municipal waste in the city of Biech. The project can logically be divided into 3 steps: 1. Preparation for the investment, carried out by developing a programme of functioning and financial analysis necessary for the submission of the application, carried out and preparation of the construction project. 2. Completion of investments in the development of the 24906 and 24909 parcels in...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0112:01, 9 March 2020DG Regio talk contribs 12,116 bytes +1,923 Created claim: summary (P836): The project plans to build a separate collection point for municipal waste in the city of Biech. The project can logically be divided into 3 steps: 1. Preparation for the investment, carried out by developing a programme of functioning and financial analysis necessary for the submission of the application, carried out and preparation of the construction project. 2. Completion of investments in the development of the 24906 and 24909 parcels in th...

24 February 2020

18 February 2020

31 January 2020

14 January 2020