Revision history of "Construction of a separate collection point for municipal waste PSZOK in Nowe Brzesko" (Q112649)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 80,042 bytes 0 Changed label, description and/or aliases in pt
  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 80,042 bytes +47 Set a claim value: summary (P836): O projeto prevê a construção de um ponto de recolha seletiva de resíduos urbanos no Espaço Económico de Nowobrzeg, em Nowe Brzesko. O projecto pode ser logicamente dividido em 3 fases:1. Preparação para o investimento, realizada através do desenvolvimento de um programa de utilização funcional e análise financeira necessária para a apresentação de uma candidatura, realizada e preparação de um projeto de construção.2. Realização de um investimento qu...

20 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3519:35, 2 March 2023DG Regio talk contribs 76,821 bytes −925 Changed label, description and/or aliases in it, da, sk, fi, ro, de, cs, bg, lv, sv, lt, ga, fr, es, hu, pt, et, sl, mt, nl, hr, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:4912:49, 27 July 2022DG Regio talk contribs 75,625 bytes +48,305 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 16,342 bytes +2,738 Created claim: summary (P836): Le projet prévoit de construire un point de collecte séparé des déchets municipaux dans la zone économique de Nowobrzeg dans la ville de Nowe Brzesko. Le projet peut logiquement être divisé en 3 étapes:1. Préparation de l’investissement, réalisé par l’élaboration d’un programme fonctionnel utilisable et l’analyse financière nécessaire à la soumission de la demande, réalisée et préparation du projet de construction.2. Réalisation de l’investissem...
  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 13,604 bytes +156 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 13,889 bytes +146 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 13,743 bytes −151 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 13,894 bytes +2,439 Created claim: summary (P836): The project plans to build a separate collection point for municipal waste in the Nowobrzeg Economic Area in Nowe Brzesko. The project can be logically divided into 3 stages:1. Preparation for the investment, carried out through the development of a functional-use programme and financial analysis necessary for the submission of an application, carried out and preparing a construction project.2. Carrying out an investment consisting of the develo...
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 11,455 bytes −1,950 Removed claim: summary (P836): The project plans to build a separate collection point for municipal waste in the New Brzesko Town area in the New Brzesko city area. The project can logically be divided into 3 steps: 1. Preparation for the investment, carried out by developing a programme of functioning and financial analysis necessary for the submission of the application, carried out and preparation of the construction project. 2. Investments consisting of the development...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0112:01, 9 March 2020DG Regio talk contribs 12,130 bytes +1,950 Created claim: summary (P836): The project plans to build a separate collection point for municipal waste in the New Brzesko Town area in the New Brzesko city area. The project can logically be divided into 3 steps: 1. Preparation for the investment, carried out by developing a programme of functioning and financial analysis necessary for the submission of the application, carried out and preparation of the construction project. 2. Investments consisting of the development of...

24 February 2020

18 February 2020

31 January 2020

14 January 2020