Revision history of "Construction of a separate waste collection point in Gródek Municipality on the Dunajec River." (Q112644)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3519:35, 2 March 2023DG Regio talk contribs 86,478 bytes +1,481 Changed label, description and/or aliases in lv, da, it, bg, sk, hr, et, es, lt, ro, pt, hu, ga, fr, sl, sv, el, mt, fi, cs, and other parts

26 October 2022

21 October 2022

27 September 2022

2 July 2022

  • curprev 15:3915:39, 2 July 2022DG Regio talk contribs 82,882 bytes +53,040 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 17,280 bytes +3,110 Created claim: summary (P836): Devant le bâtiment se trouve la construction d’un point de collecte séparé des déchets municipaux sur la partie de la parcelle no 4197 à BartkowaPosadowa autour de la zone. 0,30 ha dans la zone de terrain ou 378 lorsqu’il y a une station d’épuration d’une capacité de 600 m³ par jour. Le projet prévoit: réalisation des travaux nécessaires liés au nivellement de la zone, plantation de buissons dans la quantité de 15 pcs. écran vert, semis avec de...
  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 14,170 bytes +166 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,445 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,289 bytes −165 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,454 bytes +2,632 Created claim: summary (P836): Prior to this is the construction of a separate collection point for municipal waste on parts of plot or no. 4197 in BartkowaPosadowa o pow. 0.30 ha. in a neighboring plot of land or 378 on which there is a sewage treatment plant with a capacity of 600 m³ per day. The project envisages: carrying out necessary works related to land levelling, planting of shrubs in the amount of 15 pieces of screen green, grass sowing 0.13 ha. The construction of...
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 11,822 bytes −2,240 Removed claim: summary (P836): Upstream is the construction of a section of the municipal waste collection point for part of the plot with no 4197 in m. 0,30 In the vicinity of a plot with a plot of 378 sites on which a wastewater treatment plant with a capacity of 600 m³ per day is located. The project provides for: to carry out the necessary work in connection with the levelling of the site, setting up an shrub of 15 para-vanic green and sowing 0.13 ha to be sown with gra...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0112:01, 9 March 2020DG Regio talk contribs 12,779 bytes +2,240 Created claim: summary (P836): Upstream is the construction of a section of the municipal waste collection point for part of the plot with no 4197 in m. 0,30 In the vicinity of a plot with a plot of 378 sites on which a wastewater treatment plant with a capacity of 600 m³ per day is located. The project provides for: to carry out the necessary work in connection with the levelling of the site, setting up an shrub of 15 para-vanic green and sowing 0.13 ha to be sown with grass...

24 February 2020

18 February 2020

31 January 2020

14 January 2020