Revision history of "Removal of asbestos products from households in Bukowina Tatrzańska Municipality" (Q112642)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3015:30, 7 October 2024DG Regio talk contribs 77,807 bytes −194 Set a claim value: summary (P836): No âmbito do projeto, serão realizadas as seguintes tarefas: remoção de amianto armazenado de 12 imóveis 30,6 Mg, juntamente com a sua eliminação e remoção de amianto de edifícios em 90 agregados familiares, remoção e eliminação de 229,5 Mg de amianto As soluções adotadas no projeto são, por exemplo, de acordo com as melhores práticas num determinado domínio, as soluções utilizadas no projeto apresentam a melhor relação qualidade/preço.Todos os trab...

7 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3519:35, 2 March 2023DG Regio talk contribs 74,827 bytes +1,617 Changed label, description and/or aliases in da, it, lv, sk, bg, el, fr, ro, et, sl, ga, pt, fi, sv, cs, hr, hu, lt, nl, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:3915:39, 2 July 2022DG Regio talk contribs 71,106 bytes +44,828 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 15,791 bytes +2,570 Created claim: summary (P836): Dans le cadre du projet, les tâches suivantes seront exécutées: L’enlèvement de l’amiante stocké sur 12 propriétés de 30,6 Mg, l’élimination et l’enlèvement de l’amiante des bâtiments de 90 ménages, l’enlèvement et l’élimination de 229,5 Mg d’amianteLes solutions adoptées dans le cadre du projet sont, par exemple, conformes aux meilleures pratiques sur le terrain, les solutions utilisées dans le projet présentent un rapport qualité-prix optimal....
  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 13,221 bytes +156 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 13,506 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 13,364 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 13,511 bytes +2,209 Created claim: summary (P836): As part of the project, the following tasks will be carried out: removal of stored asbestos from 12 property 30.6 Mg along with its disposal and removal of asbestos from buildings in 90 households, removal and disposal of 229.5 Mg of asbestos The solutions adopted in the project are, for example, in accordance with best practice in a given field, the solutions used in the project present the optimal quality-to-price ratio.All work related to the...
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 11,302 bytes −1,935 Removed claim: summary (P836): The project will carry out the following tasks: the removal of the deposited asbestos from the 12-session of the 30,6 tonnes and the removal of asbestos from buildings in 90 households, the removal of asbestos from buildings in households, the removal of asbestos with 229,5 tonnes of asbestos, and the removal of asbestos resulting from the disposal of Mg of asbestos, accepted in the draft solution are, for example, consistent with best practic...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0112:01, 9 March 2020DG Regio talk contribs 11,949 bytes +1,935 Created claim: summary (P836): The project will carry out the following tasks: the removal of the deposited asbestos from the 12-session of the 30,6 tonnes and the removal of asbestos from buildings in 90 households, the removal of asbestos from buildings in households, the removal of asbestos with 229,5 tonnes of asbestos, and the removal of asbestos resulting from the disposal of Mg of asbestos, accepted in the draft solution are, for example, consistent with best practice...

24 February 2020

18 February 2020

31 January 2020

14 January 2020