Revision history of "Reconstruction of the existing municipal waste collection point in Skała Municipality" (Q112637)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 October 2022

2 July 2022

  • curprev 15:3815:38, 2 July 2022DG Regio talk contribs 75,212 bytes +46,652 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5519:55, 1 December 2021DG Regio talk contribs 16,747 bytes +3,009 Created claim: summary (P836): L’objectif du projet est d’améliorer la reconstruction du point de collecte des déchets existant.Le projet sera mis en œuvre au point existant situé dans la municipalité de Cianowice, à Skała. Le champ d’application du projet implique l’exécution de travaux de construction conformément à l’unité centrale développée. Dans le cadre de la tâche sera réalisée prace:Przebudowa bâtiments,Reconstruction de chantiers de manœuvre, routes d’accès, constru...
  • curprev 19:5519:55, 1 December 2021DG Regio talk contribs 13,738 bytes +169 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,010 bytes +147 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 13,863 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2812:28, 20 October 2020DG Regio talk contribs 14,025 bytes +2,370 Created claim: summary (P836): The aim of the project is to improve the reconstruction of the existing waste collection point.The project will be carried out on the site of an existing point located in Cianowice Skała Municipality. The task will include:Reconstruction of buildings, Reconstruction of manoeuvring yards, access roads, construction of fences Construction of waste reception points for separated fractions possibility of accepting 18 different fractions of wasteDepa...
  • curprev 12:2712:27, 20 October 2020DG Regio talk contribs 11,655 bytes −1,641 Removed claim: summary (P836): The purpose of the project is to improve the conversion of the existing waste collection point. Work will be carried out as part of the task: renovation of buildings, construction of shunting roads, access roads, construction of a waste collection point for separated fractions, the possibility to receive 18 different fractions of waste, construction of a site for bulky waste, old tyres construction of a waste entry point that can be repaired o...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0112:01, 9 March 2020DG Regio talk contribs 12,015 bytes +1,641 Created claim: summary (P836): The purpose of the project is to improve the conversion of the existing waste collection point. Work will be carried out as part of the task: renovation of buildings, construction of shunting roads, access roads, construction of a waste collection point for separated fractions, the possibility to receive 18 different fractions of waste, construction of a site for bulky waste, old tyres construction of a waste entry point that can be repaired or...

24 February 2020

18 February 2020

31 January 2020

14 January 2020