Revision history of "Removal of asbestos from households in Szaflara Municipality" (Q112627)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 58,480 bytes 0 Changed label, description and/or aliases in pt
  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 58,480 bytes +84 Set a claim value: summary (P836): O projeto consiste na realização de um projeto de remoção de produtos de eternite de amianto dos agregados familiares da comuna de Szaflary. Remoção com eliminação de produtos de amianto de 11 propriedades de 25,344 Mg de amianto e desmantelamento de amianto de 300 edifícios 1260 Mg. Produtos de amianto armazenados nas instalações após a substituição do revestimento do telhado. Desmantelamento do revestimento do telhado que contém amianto, juntament...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:3815:38, 2 July 2022DG Regio talk contribs 55,478 bytes +33,955 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5419:54, 1 December 2021DG Regio talk contribs 13,882 bytes +1,872 Created claim: summary (P836): Le projet consiste à réaliser un projet d’enlèvement des produits d’amiante de l’éternite des ménages de la municipalité de Szaflary. Élimination combinée à l’élimination des produits d’amiante de 11 propriétés de 25 344 Mg d’amiante et amiante démonté de 300 bâtiments 1260 Mg. Produits d’amiante éternite stockés dans les locaux après le remplacement du matériau de toiture. Démontage de toitures contenant de l’amiante et élimination dans 300 bât...
  • curprev 19:5419:54, 1 December 2021DG Regio talk contribs 12,010 bytes +124 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:2712:27, 20 October 2020DG Regio talk contribs 12,327 bytes +121 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2712:27, 20 October 2020DG Regio talk contribs 12,206 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2712:27, 20 October 2020DG Regio talk contribs 12,321 bytes +1,711 Created claim: summary (P836): The project consists of carrying out a project to remove asbestos ethernite products from the households of Szaflary commune. Removal with the disposal of asbestos products from 11 properties of 25.344 Mg asbestos and dismantled asbestos from 300 buildings 1260 Mg. Asbestos products stored on the premises after replacement of roof covering. Dismantling the roof covering containing asbestos together with the disposal of 1260 Mg of asbestos in 300...
  • curprev 12:2712:27, 20 October 2020DG Regio talk contribs 10,610 bytes −1,273 Removed claim: summary (P836): The project consists of a project to remove asbestos products from eternite from the households of Szaflary. In addition to the destruction of asbestos products from 11 sessions of 25,344 tonnes of asbestos and to dismantled asbestos from 300 buildings, 1260 tonnes of asbestos have been removed. Products of asbestos Eternit deposited on behalf of part of a session following an exchange of roof covering. Dismantling the roof covering containing...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0112:01, 9 March 2020DG Regio talk contribs 10,593 bytes +1,273 Created claim: summary (P836): The project consists of a project to remove asbestos products from eternite from the households of Szaflary. In addition to the destruction of asbestos products from 11 sessions of 25,344 tonnes of asbestos and to dismantled asbestos from 300 buildings, 1260 tonnes of asbestos have been removed. Products of asbestos Eternit deposited on behalf of part of a session following an exchange of roof covering. Dismantling the roof covering containing a...

24 February 2020

18 February 2020

31 January 2020

14 January 2020