Revision history of "Reconstruction of the damaged shaft of the Drwinka river in the village of Dziewin, Municipality of Drwinia" (Q112555)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 82,150 bytes +4 Changed label, description and/or aliases in pt
  • curprev 18:1918:19, 8 October 2024DG Regio talk contribs 82,146 bytes −176 Set a claim value: summary (P836): 1.O projeto tem por objetivo a realização de obras relacionadas com a remoção dos danos causados pelas inundações, ou seja, a reconstrução da parte danificada do poço, que permite a drenagem da água do sistema de valas de drenagem para o rio Drwinka através de uma fechadura do poço existente. Âmbito das obras: a demolição de outros fragmentos de veio danificado no comprimento 132 mphoto do húmus na base concebida para a reconstrução da secçãoexecuçã...

12 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3419:34, 2 March 2023DG Regio talk contribs 79,148 bytes +2,341 Changed label, description and/or aliases in lv, it, da, sk, fi, fr, et, ga, sv, ro, pt, es, de, bg, hu, el, cs, sl, hr, lt, nl, mt, and other parts

26 October 2022

21 October 2022

27 September 2022

27 July 2022

  • curprev 12:4812:48, 27 July 2022DG Regio talk contribs 74,692 bytes +46,302 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 May 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 16,663 bytes +2,754 Created claim: summary (P836): 1.L’objet du projet est l’exécution de travaux liés à l’élimination des dommages causés par les inondations, c’est-à-dire la reconstruction de la partie endommagée du puits de récif permettant le drainage de l’eau du système de drainage jusqu’à la rivière Drwinka au moyen d’une écluse existante. Champ d’application de prac:rozebranie des fragments restants de l’arbre endommagé sur la longueur de 132 m photo d’humus sur la base de la section prév...
  • curprev 19:5319:53, 1 December 2021DG Regio talk contribs 13,909 bytes +180 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:0512:05, 20 October 2020DG Regio talk contribs 14,170 bytes +169 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0512:05, 20 October 2020DG Regio talk contribs 14,001 bytes −175 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0512:05, 20 October 2020DG Regio talk contribs 14,176 bytes +2,360 Created claim: summary (P836): 1.The object of the project is to perform works related to the removal of flood damage, i.e. reconstruction of the damaged part of the shaft, which allows the drainage of water from the drainage ditch system to the Drwinka river by means of an existing shaft lock. The scope of works: demolition of other fragments of damaged shaft at length 132 mphoto of the humus in the basis designed for reconstruction of the sectionexecution of a trough of dim...
  • curprev 12:0512:05, 20 October 2020DG Regio talk contribs 11,816 bytes −2,223 Removed claim: summary (P836): 1.The project shall be carried out in connection with the removal of flood damage, i.e. reconstruction of the damaged part of the vacuum shaft which makes it possible to divert the land from a system of drainage ditches into the Dwinka river by means of an existing roller lock. The scope of the prac:rozebranie other parts of the damaged 132mPicture of the damaged shaft 2x0.5 m in order to reconstruct the section of the drain bed with dimension...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4911:49, 9 March 2020DG Regio talk contribs 12,767 bytes +2,223 Created claim: summary (P836): 1.The project shall be carried out in connection with the removal of flood damage, i.e. reconstruction of the damaged part of the vacuum shaft which makes it possible to divert the land from a system of drainage ditches into the Dwinka river by means of an existing roller lock. The scope of the prac:rozebranie other parts of the damaged 132mPicture of the damaged shaft 2x0.5 m in order to reconstruct the section of the drain bed with dimensions...

24 February 2020

18 February 2020

31 January 2020

14 January 2020