Revision history of "Construction of a system of bicycle paths and walking tracks in the district road from Aleksandrowice to the intersection with the voivodeship road in Balice on the A4 motorway in Zabierzów" (Q112519)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 October 2022

2 July 2022

  • curprev 15:3615:36, 2 July 2022DG Regio talk contribs 74,971 bytes +46,467 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5519:55, 1 December 2021DG Regio talk contribs 16,692 bytes +2,707 Created claim: summary (P836): L’objet du projet est de réaliser des projets et de réaliser sur la base de ceux-ci un assortiment complet de travaux de construction énumérés ci-dessous pendant la route de district sur une longueur d’environ. 2 780 m, soit d’environ 2 550 km à Balice à environ 5 320 km à Aleksandrowice selon l’héctométrie adoptée pour décrire des tronçons de la route à la demande de décision environnementale.Dans ce tronçon de la route sera conçu et construit,...
  • curprev 19:5519:55, 1 December 2021DG Regio talk contribs 13,985 bytes +267 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:0512:05, 20 October 2020DG Regio talk contribs 14,159 bytes +252 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0412:04, 20 October 2020DG Regio talk contribs 13,907 bytes −254 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0412:04, 20 October 2020DG Regio talk contribs 14,161 bytes +2,293 Created claim: summary (P836): The object of the project is to carry out projects on the basis of them complete assortment of the necessary assortment, the following construction works within the district road for approx. 2780 m, i.e. from approx. 2550 in Balice to approx. km 5320 in Aleksandrowice according to the adopted work hectometer used to describe the sections of the road to the application for an environmental decision.In this section the roads will be designed and c...
  • curprev 12:0412:04, 20 October 2020DG Regio talk contribs 11,868 bytes −2,087 Removed claim: summary (P836): The project aims to implement the projects and complete the following works on the basis of the project, the following works being carried out within the district road around the length of the district. 2 780 m, i.e. from about km 2550 in m. Balice up to approx. 5 320 m. 157 m² construction of the cycle path over the length approx. 945 m³.roll of softones over a length ca. 2776 m4.construction and upgrading of street lighting. 2530 m5.drainage...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4811:48, 9 March 2020DG Regio talk contribs 12,679 bytes +2,087 Created claim: summary (P836): The project aims to implement the projects and complete the following works on the basis of the project, the following works being carried out within the district road around the length of the district. 2 780 m, i.e. from about km 2550 in m. Balice up to approx. 5 320 m. 157 m² construction of the cycle path over the length approx. 945 m³.roll of softones over a length ca. 2776 m4.construction and upgrading of street lighting. 2530 m5.drainage u...

24 February 2020

18 February 2020

31 January 2020

14 January 2020