Revision history of "Improving air quality in the municipality of Tuchów by replacing old boilers and kilns with solid fuels in individual households – for new ones, also using solid fuels" (Q112425)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3419:34, 2 March 2023DG Regio talk contribs 77,590 bytes +1,087 Changed label, description and/or aliases in lv, it, bg, da, sk, et, hr, ro, es, lt, pt, hu, fr, nl, ga, sv, sl, el, de, fi, mt, cs, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:3415:34, 2 July 2022DG Regio talk contribs 74,394 bytes +46,996 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 12:1312:13, 1 December 2021DG Regio talk contribs 16,263 bytes +2,632 Created claim: summary (P836): Le projet comprend: remplacer les anciennes sources de chaleur par de nouvelles pour les combustibles solides pour 140 bâtiments. Les nouveaux équipements seront alimentés par des combustibles solides à l’exclusion de la biomasse. Le remplacement des installations internes pour 105 bâtiments réduisant les émissions de CO2 et les émissions de PM10 et de PM2,5 est présenté dans la partie Q. Le projet ne prévoit pas de raccordement au réseau de cha...
  • curprev 12:1312:13, 1 December 2021DG Regio talk contribs 13,631 bytes +298 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:1012:10, 20 October 2020DG Regio talk contribs 13,774 bytes +232 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:1012:10, 20 October 2020DG Regio talk contribs 13,542 bytes −226 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:1012:10, 20 October 2020DG Regio talk contribs 13,768 bytes +2,220 Created claim: summary (P836): The project shall include: replacement of old heat sources for new ones for solid fuels for 140 buildings. New equipment will be powered by solid fuels excluding biomass. replacement of internal installations for 105 buildings reducing CO2 emissions and reduction of PM10 and PM2.5 emissions is specified in Part Q.The project does not plan to connect to the local heating network. There is one local boiler house in one of the housing estates. The...
  • curprev 12:1012:10, 20 October 2020DG Regio talk contribs 11,548 bytes −1,315 Removed claim: summary (P836): The project includes: the replacement of old heat sources into new solid fuels for 140 buildings. The new installations will be powered by solid fuels, with the exception of biomastics. the replacement of internal installations for the 105 buildings with CO2 emission reduction and the reduction of PM10 and PM2,5 emissions is provided in part Q.In the framework of the project, the connection to the local district heating network is not planned....

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4711:47, 9 March 2020DG Regio talk contribs 11,573 bytes +1,315 Created claim: summary (P836): The project includes: the replacement of old heat sources into new solid fuels for 140 buildings. The new installations will be powered by solid fuels, with the exception of biomastics. the replacement of internal installations for the 105 buildings with CO2 emission reduction and the reduction of PM10 and PM2,5 emissions is provided in part Q.In the framework of the project, the connection to the local district heating network is not planned. W...

24 February 2020

18 February 2020

31 January 2020

14 January 2020