Revision history of "Comprehensive energy modernisation of the SP ZOZ facility in Osiek with the conversion of the coal boiler room into gas" (Q112272)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 90,263 bytes −13 Changed label, description and/or aliases in pt
  • curprev 16:1916:19, 10 October 2024DG Regio talk contribs 90,276 bytes +75 Set a claim value: summary (P836): Com base na análise efetuada na auditoria, foi escolhida como a melhor opção do projeto de modernização para o edifício avaliado. Esta opção inclui as seguintes melhorias de modernização a implementar no edifício SP ZOZ: — a melhoria consiste na substituição da caldeira a carvão por uma nova capacidade de condensação de gás de 59 kW. Além disso, serão implementadas reduções semanais e diárias no aquecimento, – aquecimento de 453 m2 de telhado com no...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3419:34, 2 March 2023DG Regio talk contribs 87,027 bytes −879 Changed label, description and/or aliases in da, it, sk, cs, et, ro, lv, de, fi, el, hr, ga, mt, sv, fr, bg, sl, pt, lt, nl, hu, es, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:3015:30, 2 July 2022DG Regio talk contribs 85,781 bytes +55,659 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 12:1112:11, 1 December 2021DG Regio talk contribs 17,497 bytes +3,109 Created claim: summary (P836): Sur la base de l’analyse effectuée dans le cadre de l’audit, il a été choisi comme option optimale pour le projet de modernisation du bâtiment évalué. Cette option comprend les améliorations suivantes de modernisation à mettre en œuvre dans le bâtiment SP ZOZ: — L’amélioration consiste à remplacer la chaudière à charbon par un nouveau gaz de condensation d’une puissance de 59 kW. En outre, l’affaiblissement hebdomadaire et quotidien du chauffage...
  • curprev 12:1112:11, 1 December 2021DG Regio talk contribs 14,388 bytes +187 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:2611:26, 20 October 2020DG Regio talk contribs 14,642 bytes +181 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2611:26, 20 October 2020DG Regio talk contribs 14,461 bytes −169 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2611:26, 20 October 2020DG Regio talk contribs 14,630 bytes +2,758 Created claim: summary (P836): Based on the analysis carried out in the audit, it was chosen as the optimal option of the modernisation project for the evaluated building. This option includes the following modernisation improvements to be implemented in the building SP ZOZ: — the improvement consists of replacing the coal boiler with a new gas condensation capacity of 59 kW. In addition, weekly and daily reductions in heating will be implemented, – warming of 453 m² of roof...
  • curprev 11:2611:26, 20 October 2020DG Regio talk contribs 11,872 bytes −2,303 Removed claim: summary (P836): On the basis of the audit carried out, the audit was selected as the optimal option for the modernisation project for the building assessed. This option includes the following improvement improvements to be achieved in the SPZOZ Building: The improvement consists of the replacement of a coal boiler with a new gas condensing gas of 59 kW. In addition, weekly and daily dilution will be implemented in heating, 453 m² of roof together with replace...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4311:43, 9 March 2020DG Regio talk contribs 12,885 bytes +2,303 Created claim: summary (P836): On the basis of the audit carried out, the audit was selected as the optimal option for the modernisation project for the building assessed. This option includes the following improvement improvements to be achieved in the SPZOZ Building: The improvement consists of the replacement of a coal boiler with a new gas condensing gas of 59 kW. In addition, weekly and daily dilution will be implemented in heating, 453 m² of roof together with replaceme...

24 February 2020

18 February 2020

31 January 2020

14 January 2020