Revision history of "Modernisation of public buildings in Lubień commune" (Q112268)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:4312:43, 27 July 2022DG Regio talk contribs 70,464 bytes +44,333 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 12:1112:11, 1 December 2021DG Regio talk contribs 15,748 bytes +2,601 Created claim: summary (P836): Dans le cadre du projet, deux tâches d’investissement sont prévues: 1. Modernisation énergétique globale du bâtiment no 34: — Réchauffement du plafond au-dessus de la salle de bal et du bureau (W1) — Réchauffement des murs extérieurs recouverts de tôle (W1) — Réchauffement du plafond au-dessus de l’aile SE et de l’arrière du Hall (W1) — Réchauffement des murs extérieurs au g.38 cm (W1) — Modernisation du système de chauffage — Modernisation du s...
  • curprev 12:1112:11, 1 December 2021DG Regio talk contribs 13,147 bytes +122 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:2311:23, 20 October 2020DG Regio talk contribs 13,466 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2311:23, 20 October 2020DG Regio talk contribs 13,353 bytes −122 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2311:23, 20 October 2020DG Regio talk contribs 13,475 bytes +2,236 Created claim: summary (P836): The project plans to carry out two investment tasks: 1. Comprehensive energy modernisation of building 34: — Warming of the floor above the ballroom and office (W1) – Warming of the outer walls covered with sheet metal (W1) – Warming of the ceiling over the SE wing and the room’s facilities (W1) – Warming of the outer walls of 1.2 cm (W1) – Modernisation of the heating system – Modernisation of the lighting system – Warming of the ceiling over t...
  • curprev 11:2311:23, 20 October 2020DG Regio talk contribs 11,239 bytes −2,021 Removed claim: summary (P836): Two investment tasks are planned under the project: 1. Comprehensive energy modernisation of Building No. 34: — the insulation of the ballast room and the office (W1) — the insulation of external walls covered by the sheet (W1) — the warming of the body wall with the SE and the Sali wall (W1) — the warming of the shell of the SE and the Sali wall (W38) — modernisation of the heating system — Modernisation of the lighting system — Modernisation...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4211:42, 9 March 2020DG Regio talk contribs 11,971 bytes +2,021 Created claim: summary (P836): Two investment tasks are planned under the project: 1. Comprehensive energy modernisation of Building No. 34: — the insulation of the ballast room and the office (W1) — the insulation of external walls covered by the sheet (W1) — the warming of the body wall with the SE and the Sali wall (W1) — the warming of the shell of the SE and the Sali wall (W38) — modernisation of the heating system — Modernisation of the lighting system — Modernisation o...

24 February 2020

18 February 2020

31 January 2020

14 January 2020