Revision history of "Thermal modernisation of educational and administrative buildings of the Brzeski District" (Q112226)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3419:34, 2 March 2023DG Regio talk contribs 88,848 bytes −257 Changed label, description and/or aliases in lv, da, sk, it, fi, fr, et, cs, ga, pt, sl, lt, bg, ro, hu, hr, nl, es, mt, sv, el, de, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:2915:29, 2 July 2022DG Regio talk contribs 87,003 bytes +57,108 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 11:1411:14, 1 December 2021DG Regio talk contribs 17,541 bytes +3,162 Created claim: summary (P836): Le projet est pleinement conforme aux audits énergétiques réalisés pour les deux bâtiments. Bâtiment administratif du bureau de district de Piastowska 2B: 1. Le remplacement des installations de tuyaux en acier et le remplacement des radiateurs en fonte par des plaques, l’utilisation de thermostats, de vannes verticales et de compteurs de chaleur; 2. Installation centrale existante à partir de la salle de chaudière à gaz + pompe à chaleur compre...
  • curprev 11:1411:14, 1 December 2021DG Regio talk contribs 14,379 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,674 bytes +150 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,524 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,672 bytes +2,845 Created claim: summary (P836): The project is fully compatible with the conducted energy audits for both buildings. Administrative building of the District Starostwo at Piastowska 2B: 1. Replacement of installation from steel pipes and replacement of cast iron radiators for plates, use of thermostats, upholstery valves and heat meters; 2. Existing central installation from the gas boiler room + compressor heat pump, 3. Installation of air conditioning in the VRF system; 4. Wa...
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 11,827 bytes −2,393 Removed claim: summary (P836): The project is fully in line with the energy audits carried out for both buildings. Administrative building at Piastorska 2B: 1. Replacement of steel tube systems and replacement of cast iron tubes to plate, use of thermostats, sub-vertical valves and heat meters; 2. Existing central gas installation with gas boiler + compressor heat pump, 3. The installation of an air-conditioning system in the VRF system; 4. Insulation of external walls; 5....

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4211:42, 9 March 2020DG Regio talk contribs 12,943 bytes +2,393 Created claim: summary (P836): The project is fully in line with the energy audits carried out for both buildings. Administrative building at Piastorska 2B: 1. Replacement of steel tube systems and replacement of cast iron tubes to plate, use of thermostats, sub-vertical valves and heat meters; 2. Existing central gas installation with gas boiler + compressor heat pump, 3. The installation of an air-conditioning system in the VRF system; 4. Insulation of external walls; 5. In...

24 February 2020

18 February 2020

31 January 2020

14 January 2020