Revision history of "Thermal modernisation of public buildings and increased use of renewable energy sources in the municipality of Chełmiec" (Q112225)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 94,474 bytes +8 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 94,466 bytes −3 Set a claim value: summary (P836): O investimento consiste na realização de obras de modernização térmica, modernização de sistemas de aquecimento, utilização de FER (fotovoltaicas, coletores solares, biomassa) em 11 edifícios de utilidade pública. O âmbito ótimo dos trabalhos foi determinado com base em auditorias energéticas desenvolvidas de acordo com o método «...»: O âmbito do trabalho de auditoria e outros elementos necessários incluem as seguintes tarefas e atividades (descrit...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3419:34, 2 March 2023DG Regio talk contribs 91,295 bytes −529 Changed label, description and/or aliases in da, lv, fr, ro, hu, fi, es, hr, sk, cs, bg, el, sl, lt, et, pt, nl, ga, mt, sv, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:4312:43, 27 July 2022DG Regio talk contribs 89,708 bytes +58,906 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 11:1411:14, 1 December 2021DG Regio talk contribs 17,782 bytes +3,200 Created claim: summary (P836): L’investissement consiste en des travaux de modernisation thermique, de modernisation des systèmes de chauffage, d’application des SER (photovoltaïque, capteurs solaires, biomasse) dans 11 bâtiments publics. La portée optimale des travaux a été déterminée sur la base d’audits énergétiques élaborés conformément à la «méthodologie de...»: Le champ d’application des travaux d’audit et les autres éléments nécessaires comprennent les tâches et activi...
  • curprev 11:1411:14, 1 December 2021DG Regio talk contribs 14,582 bytes +211 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,812 bytes +182 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,630 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,798 bytes +2,893 Created claim: summary (P836): The investment consists of carrying out thermal modernisation works, modernisation of heating systems, the use of RES (photovoltaics, solar collectors, biomass) in 11 public utility buildings. The optimal scope of work was determined on the basis of energy audits developed in accordance with the “... method”: The scope of audit work and other necessary elements include the following tasks and activities (described in detail in point C.2.3): 1.Pr...
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 11,905 bytes −2,173 Removed claim: summary (P836): The investment consists of the renovation of heating systems, the modernisation of heating systems, the use of RES (photovoltaic, solar collectors, biomass) in 11 public buildings. The optimal scope of work was determined on the basis of energy audits prepared in accordance with ‘Methodology...’: The scope of the audit work and the other necessary elements include the following tasks and activities (detailed in point C.2.3): 1.Preparatory cost...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4211:42, 9 March 2020DG Regio talk contribs 12,794 bytes +2,173 Created claim: summary (P836): The investment consists of the renovation of heating systems, the modernisation of heating systems, the use of RES (photovoltaic, solar collectors, biomass) in 11 public buildings. The optimal scope of work was determined on the basis of energy audits prepared in accordance with ‘Methodology...’: The scope of the audit work and the other necessary elements include the following tasks and activities (detailed in point C.2.3): 1.Preparatory costs:...

24 February 2020

18 February 2020

31 January 2020

14 January 2020