Revision history of "Thermal modernisation of the historic armory building at ul. Rakowicka 22 in Krakow as part of an adaptation at the exhibition and education centre of the Museum of Photography in Krakow" (Q112221)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 90,465 bytes +9 Changed label, description and/or aliases in pt
  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 90,456 bytes +5 Set a claim value: summary (P836): O investimento realizado no âmbito do projeto consiste na realização de obras de modernização térmica, modernização do sistema de aquecimento e utilização de um sistema moderno de gestão de edifícios definido à disposição da AUDIDADE ENERGÉTICA. O âmbito dos trabalhos de modernização térmica previstos no projeto inclui os seguintes tratamentos:1. Isolamento das paredes exteriores. a partir do interior 2. Aquecimento do telhado com lã mineral, juntam...

12 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3419:34, 2 March 2023DG Regio talk contribs 87,277 bytes −2,102 Changed label, description and/or aliases in it, da, lv, sk, es, ro, cs, fi, et, ga, fr, lt, nl, hu, mt, sv, el, hr, pt, bg, de, sl, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:2915:29, 2 July 2022DG Regio talk contribs 87,281 bytes +56,793 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 11:1411:14, 1 December 2021DG Regio talk contribs 17,743 bytes +3,126 Created claim: summary (P836): L’investissement réalisé dans le cadre du projet consiste à réaliser des travaux de thermomodernisation, de modernisation du système de chauffage et d’application d’un système moderne de gestion des bâtiments défini sur la base de l’AUDIT ENERGETIC. Le champ des travaux de thermomodernisation prévus dans le projet comprend les traitements suivants:1. Isolation des murs extérieurs de l’intérieur 2. Isolation du toit avec de la laine minérale avec...
  • curprev 11:1411:14, 1 December 2021DG Regio talk contribs 14,617 bytes +259 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,799 bytes +248 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,551 bytes −274 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 14,825 bytes +2,787 Created claim: summary (P836): The investment carried out within the framework of the project consists of carrying out thermal modernisation works, modernisation of the heating system and the use of modern building management system defined at the disposal of the ENERGETIVE AUDITY.The scope of work on thermal modernisation planned in the project includes the following treatments:1. Insulation of the outer walls. from the inside 2. Warming of the roof with mineral wool along w...
  • curprev 11:2211:22, 20 October 2020DG Regio talk contribs 12,038 bytes −2,316 Removed claim: summary (P836): The investment carried out under the project involves the renovation of thermal modernisation, modernisation of the heating system and the application of the modern management system of the building as defined by AUDIT ENERGY PROJECT, consisting of the following actions: 1. Wall insulation from inside 2. Insulation of the mineral wool together with the replacement of the structure. 3. The warming of the floor on the ground after the floor laye...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4211:42, 9 March 2020DG Regio talk contribs 13,061 bytes +2,316 Created claim: summary (P836): The investment carried out under the project involves the renovation of thermal modernisation, modernisation of the heating system and the application of the modern management system of the building as defined by AUDIT ENERGY PROJECT, consisting of the following actions: 1. Wall insulation from inside 2. Insulation of the mineral wool together with the replacement of the structure. 3. The warming of the floor on the ground after the floor layers...

24 February 2020

18 February 2020

31 January 2020

14 January 2020