Revision history of "Improving the energy efficiency of P.P.U.H. “Bim” Mariusz Balon through investments in renewable energy generation" (Q112121)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1818:18, 8 October 2024DG Regio talk contribs 79,469 bytes +5 Changed label, description and/or aliases in pt
  • curprev 18:1818:18, 8 October 2024DG Regio talk contribs 79,464 bytes −195 Set a claim value: summary (P836): O objetivo do projeto é produzir eletricidade verde a partir de fontes renováveis para efeitos de fornecimento de energia das instalações de alojamento e do escritório da empresa e diversificar as fontes de aquecimento, a fim de reduzir o consumo de combustível sólido no outono da primavera. Além disso, prevê-se conseguir poupanças no consumo de eletricidade e água na operação de água quente. A fim de executar corretamente o projeto, serão realizada...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:4012:40, 27 July 2022DG Regio talk contribs 72,415 bytes +45,143 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5819:58, 1 December 2021DG Regio talk contribs 16,225 bytes +2,703 Created claim: summary (P836): Le demandeur a l’intention de mettre en œuvre un projet global de type A et B par la modernisation énergétique de l’installation et l’utilisation de sources d’énergie renouvelables. Le principal objectif du projet est la production d’électricité verte à partir de sources renouvelables aux fins de l’approvisionnement énergétique de l’installation d’hébergement et du bureau de l’entreprise et la diversification des sources de chauffage de l’instal...
  • curprev 19:5819:58, 1 December 2021DG Regio talk contribs 13,522 bytes +203 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 13,760 bytes +180 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 13,580 bytes −188 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 13,768 bytes +2,196 Created claim: summary (P836): The aim of the project is to generate green electricity from renewable sources for the purposes of energy supply of the accommodation facility and the company’s office and diversify heating sources in order to reduce the consumption of solid fuel in the autumn of spring. In addition, it is planned to achieve savings in electricity and water consumption in the operation of hot water. In order to implement the project correctly, the following task...
  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 11,572 bytes −1,724 Removed claim: summary (P836): The applicant intends to implement a comprehensive type A and B through energy modernisation of the plant and the use of renewable energy sources. In addition, it is planned to achieve savings in the consumption of electricity and water in the operation of domestic hot water. In order to ensure the correct implementation of the project, the following tasks will be carried out: 1. Modernisation of the hot water system 2. Modernisation of the he...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3711:37, 9 March 2020DG Regio talk contribs 12,005 bytes +1,724 Created claim: summary (P836): The applicant intends to implement a comprehensive type A and B through energy modernisation of the plant and the use of renewable energy sources. In addition, it is planned to achieve savings in the consumption of electricity and water in the operation of domestic hot water. In order to ensure the correct implementation of the project, the following tasks will be carried out: 1. Modernisation of the hot water system 2. Modernisation of the heat...

24 February 2020

18 February 2020

31 January 2020

14 January 2020