Revision history of "Construction and modernisation of the power grid with voltage SN and nN enabling connection of electricity generation units from RES in the districts of Nowytar and Tatra Stage 1" (Q112117)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 90,645 bytes −33 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 90,678 bytes +24 Set a claim value: summary (P836): A execução do projeto é necessária para assegurar o bom funcionamento da rede elétrica no distrito de Powiats: é New e Tatra. Nos municípios onde o projeto está localizado, está previsto um aumento significativo do número de instalações FER que produzem eletricidade.O projeto consiste em três tarefas de construção de linhas lineares:Tarefa 1. Construção da rede aérea de cabo SN 15 kV de relações: Estação 6733 Leśnica 5, coluna C 231, a fim de ligar...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3319:33, 2 March 2023DG Regio talk contribs 87,480 bytes −983 Changed label, description and/or aliases in sk, lv, da, it, et, cs, fi, hr, sv, de, ro, lt, sl, fr, pt, bg, es, nl, el, ga, hu, mt, and other parts

3 December 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:3912:39, 27 July 2022DG Regio talk contribs 85,149 bytes +54,893 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0220:02, 1 December 2021DG Regio talk contribs 17,621 bytes +3,069 Created claim: summary (P836): La mise en œuvre du projet est nécessaire pour assurer le bon fonctionnement du réseau électrique dans les districts: les New York et les Tatras. Dans les communes où le projet est situé, une augmentation significative du nombre d’installations SER produisant de l’électricité est prévue.Le projet comprend 3 tâches pour la construction de liens de chaînes liniowych:Zadanie 1. Construction du réseau câblé aérien SN 15 kV relation: station 6733 Leś...
  • curprev 20:0220:02, 1 December 2021DG Regio talk contribs 14,552 bytes +274 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 14,719 bytes +240 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 14,479 bytes −264 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 14,743 bytes +2,668 Created claim: summary (P836): Implementation of the project is necessary to ensure the proper functioning of the electricity grid in the district of powiats: it’s New and Tatra. In communes where the project is located, a significant increase in the number of RES installations producing electricity is planned.The project consists of 3 tasks of building linear lines:Task 1. Construction of the overhead cable network SN 15 kV of relations: station 6733 Leśnica 5 column C 231 i...
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 12,075 bytes −1,945 Removed claim: summary (P836): The project is necessary to ensure the correct operation of the power grid in the district of: cancer and Tatar. In the municipalities where the project is located, there is a significant increase in the number of RES installations producing electricity. the project is made up of 3 projects for the construction of links between lines: activity 1. Construction of overhead 15 kV overhead cable network: station 6733 Forestry 5 pillar C 231 in ord...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3711:37, 9 March 2020DG Regio talk contribs 12,731 bytes +1,945 Created claim: summary (P836): The project is necessary to ensure the correct operation of the power grid in the district of: cancer and Tatar. In the municipalities where the project is located, there is a significant increase in the number of RES installations producing electricity. the project is made up of 3 projects for the construction of links between lines: activity 1. Construction of overhead 15 kV overhead cable network: station 6733 Forestry 5 pillar C 231 in order...

24 February 2020

18 February 2020

31 January 2020

14 January 2020