Revision history of "Construction and modernisation of the power grid with voltage SN and nN allowing connection of electricity generation units from RES in the district of Nowosądecki stage 1." (Q112114)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 93,377 bytes −9 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 93,386 bytes −119 Set a claim value: summary (P836): O projeto tem por objeto a modernização da linha baixa de 0,4 kV e a tensão média de 30 kV, que consiste na substituição de fios e cabos. Serão trocados cabos aéreos não isolados, que serão convertidos em novos cabos isolados com maior secção transversal. Tal aumentará a capacidade da rede elétrica e a capacidade de ligar novas fontes de energia renováveis. Será igualmente assegurado o bom funcionamento da rede elétrica, permitindo a ligação das uni...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3319:33, 2 March 2023DG Regio talk contribs 90,331 bytes +680 Changed label, description and/or aliases in lv, it, sk, da, cs, pt, fi, et, fr, sl, el, sv, ro, hr, ga, lt, de, mt, nl, hu, es, bg, and other parts

3 December 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:2715:27, 2 July 2022DG Regio talk contribs 86,317 bytes +55,885 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0220:02, 1 December 2021DG Regio talk contribs 17,539 bytes +3,017 Created claim: summary (P836): L’objet du projet est la modernisation de la ligne basse 0,4 kV et de la moyenne tension 30 kV par le remplacement des fils et des câbles. Les lignes aériennes non isolées seront remplacées par des lignes aériennes isolées, qui seront remplacées par des fils isolés d’un nouveau type à section transversale accrue. Cela augmentera la capacité du réseau électrique et la capacité de raccordement de nouvelles capacités SER. Le bon fonctionnement du r...
  • curprev 20:0220:02, 1 December 2021DG Regio talk contribs 14,522 bytes +272 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,691 bytes +235 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,456 bytes −233 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,689 bytes +2,682 Created claim: summary (P836): The subject of the project is the modernisation of the low 0.4 kV line and the average voltage of 30 kV consisting of the replacement of wires and cables. Non-insulated overhead line cables will be exchanged, which will be converted into new insulated cables with an increased cross-section. This will increase the capacity of the electricity grid and the ability to connect new RES power. The proper functioning of the electricity grid will also be...
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 12,007 bytes −2,322 Removed claim: summary (P836): The project aims at upgrading the 0.4 kV low and medium 30 kV line by replacing wires and cables. The exchanges shall be subject to non-insulated lines of overhead lines that will be replaced by new type insulated lines with increased cross-sections. This will increase the capacity of the electricity grid and the capacity to connect new RES capacity. It will also be ensured that the electricity network makes it possible to connect renewable en...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3711:37, 9 March 2020DG Regio talk contribs 13,040 bytes +2,322 Created claim: summary (P836): The project aims at upgrading the 0.4 kV low and medium 30 kV line by replacing wires and cables. The exchanges shall be subject to non-insulated lines of overhead lines that will be replaced by new type insulated lines with increased cross-sections. This will increase the capacity of the electricity grid and the capacity to connect new RES capacity. It will also be ensured that the electricity network makes it possible to connect renewable ener...

24 February 2020

18 February 2020

31 January 2020

14 January 2020