8 October 2024

  • curprev 18:1818:18, 8 October 2024DG Regio talk contribs 92,690 bytes −36 Changed label, description and/or aliases in pt
  • curprev 18:1818:18, 8 October 2024DG Regio talk contribs 92,726 bytes −124 Set a claim value: summary (P836): O objeto do projeto é a modernização da linha baixa de 0,4 kV e a tensão média de 15 kV, que envolve a substituição de cabos e cabos.A substituição será sujeita a cabos aéreos não isolados, que serão substituídos por novos cabos isolados com maior secção transversal. Tal aumentará a capacidade da rede elétrica e a capacidade de ligar novas fontes de energia renováveis. Será igualmente assegurado o bom funcionamento da rede elétrica, permitindo a lig...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3319:33, 2 March 2023DG Regio talk contribs 89,676 bytes +1,179 Changed label, description and/or aliases in lv, it, da, sk, ro, sv, fr, fi, hr, sl, et, ga, de, hu, bg, lt, pt, nl, es, mt, cs, el, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:3912:39, 27 July 2022DG Regio talk contribs 86,384 bytes +55,987 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0220:02, 1 December 2021DG Regio talk contribs 17,559 bytes +3,022 Created claim: summary (P836): L’objet du projet est la modernisation de la ligne basse de 0,4 kV et la tension moyenne de 15 kV par le remplacement des fils et des câbles. Le remplacement sera soumis à des lignes aériennes non isolées, qui seront remplacées par de nouveaux fils isolés à section transversale accrue. Cela augmentera la capacité du réseau électrique et la capacité de raccordement de nouvelles capacités SER. Le bon fonctionnement du réseau électrique sera égalem...
  • curprev 20:0220:02, 1 December 2021DG Regio talk contribs 14,537 bytes +270 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,708 bytes +229 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,479 bytes −230 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,709 bytes +2,687 Created claim: summary (P836): The subject of the project is the modernisation of the low 0.4 kV line and the average voltage of 15 kV, which involves the replacement of cables and cables.The replacement will be subject to uninsulated overhead line cables, which will be replaced by new insulated cables with increased cross-section. This will increase the capacity of the electricity grid and the ability to connect new RES power. The proper functioning of the electricity grid w...
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 12,022 bytes −2,343 Removed claim: summary (P836): The project involves the upgrading of a 0.4 kV line and a kV mean voltage of 15 kV. the replacement of wires and tubes will be subject to non-insulated lines of overhead lines, which will be replaced by new type insulated lines with increased cross-sections. This will increase the capacity of the electricity grid and the capacity to connect new RES capacity. It will also be ensured that the electricity network makes it possible to connect rene...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3711:37, 9 March 2020DG Regio talk contribs 13,074 bytes +2,343 Created claim: summary (P836): The project involves the upgrading of a 0.4 kV line and a kV mean voltage of 15 kV. the replacement of wires and tubes will be subject to non-insulated lines of overhead lines, which will be replaced by new type insulated lines with increased cross-sections. This will increase the capacity of the electricity grid and the capacity to connect new RES capacity. It will also be ensured that the electricity network makes it possible to connect renewa...

24 February 2020

18 February 2020

31 January 2020

14 January 2020