Revision history of "Reconstruction of the power grid with voltage SN and nN allowing connection of electricity generation units from RES in the Tarnów district stage II" (Q112103)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 89,059 bytes −7 Changed label, description and/or aliases in pt
  • curprev 15:3115:31, 7 October 2024DG Regio talk contribs 89,066 bytes +91 Set a claim value: summary (P836): A execução do projeto assegurará o bom funcionamento das redes elétricas nas cidades selecionadas do distrito de Tarnów, alargando a possibilidade de ligar novas unidades de produção de eletricidade a partir de fontes renováveis em dispersão. Nos municípios onde o projeto está localizado, está previsto um aumento significativo do número de instalações FER que produzem eletricidade. O projeto consiste em seis tarefas para reconstruir a rede de baixa...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3319:33, 2 March 2023DG Regio talk contribs 85,801 bytes −2,050 Changed label, description and/or aliases in da, it, sk, cs, fi, de, lv, et, sv, el, pt, ga, bg, hr, nl, ro, hu, es, lt, mt, sl, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:2715:27, 2 July 2022DG Regio talk contribs 85,738 bytes +55,756 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5219:52, 1 December 2021DG Regio talk contribs 17,377 bytes +3,008 Created claim: summary (P836): La mise en œuvre du projet garantira le bon fonctionnement des réseaux électriques dans certaines localités du district de Tarnów, en étendant la possibilité de raccorder de nouvelles unités de production d’électricité à partir de sources renouvelables dans les régions dispersées. Dans les municipalités où le projet est situé, une augmentation significative du nombre d’installations SER produisant de l’électricité est prévue. Le projet comprend...
  • curprev 19:5219:52, 1 December 2021DG Regio talk contribs 14,369 bytes +254 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,556 bytes +211 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,345 bytes −195 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,540 bytes +2,701 Created claim: summary (P836): The implementation of the project will ensure the proper functioning of electricity networks in the selected towns of Tarnów county, extending the possibility of connecting new units of electricity generation from renewable sources in dispersal. In municipalities where the project is located, a significant increase in the number of RES installations producing electricity is planned. The project consists of six tasks to rebuild the low-voltage ne...
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 11,839 bytes −2,218 Removed claim: summary (P836): The project will ensure the proper functioning of the electricity networks in the selected localities of the Tarnowski district by extending the possibility to connect new units of electricity generation from renewable sources in diffusion. In the municipalities where the project is located, there is a significant increase in the number of RES installations producing electricity. The project consists of six tasks of the conversion of the low-v...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3711:37, 9 March 2020DG Regio talk contribs 12,765 bytes +2,218 Created claim: summary (P836): The project will ensure the proper functioning of the electricity networks in the selected localities of the Tarnowski district by extending the possibility to connect new units of electricity generation from renewable sources in diffusion. In the municipalities where the project is located, there is a significant increase in the number of RES installations producing electricity. The project consists of six tasks of the conversion of the low-vol...

24 February 2020

18 February 2020

31 January 2020

14 January 2020