Revision history of "Reconstruction of the power grid with SN and NN voltages allowing connection of electricity generation units from RES in the Bocheń and Brest districts" (Q112102)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0718:07, 9 October 2024DG Regio talk contribs 93,705 bytes −9 Changed label, description and/or aliases in pt
  • curprev 18:0718:07, 9 October 2024DG Regio talk contribs 93,714 bytes +130 Set a claim value: summary (P836): A execução do projeto assegurará o bom funcionamento das redes de eletricidade em cidades selecionadas dos distritos de Bocheń e Brest, alargando a possibilidade de ligar novas unidades de produção de eletricidade a partir de fontes renováveis em dispersão. Nos municípios onde o projeto está localizado, prevê-se um aumento significativo do número de instalações FER que produzem eletricidade. O projeto consiste em 5 tarefas de reconstrução da rede de...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:4116:41, 2 March 2023DG Regio talk contribs 90,049 bytes −2,584 Changed label, description and/or aliases in it, da, lv, bg, sk, ro, pt, et, fr, hr, cs, hu, lt, es, sv, de, nl, ga, el, sl, mt, fi, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:2715:27, 2 July 2022DG Regio talk contribs 88,905 bytes +58,002 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5219:52, 1 December 2021DG Regio talk contribs 17,777 bytes +3,109 Created claim: summary (P836): La mise en œuvre du projet garantira le bon fonctionnement des réseaux électriques dans certaines localités des districts de Bocheński et de Brest, en étendant la possibilité de raccorder de nouvelles unités de production d’électricité à partir de sources renouvelables en dispersion. Dans les municipalités où le projet est situé, le nombre d’installations SER produisant de l’électricité devrait augmenter considérablement. Le projet comprend 5 tâ...
  • curprev 19:5219:52, 1 December 2021DG Regio talk contribs 14,668 bytes +258 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,851 bytes +214 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,637 bytes −213 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,850 bytes +2,861 Created claim: summary (P836): The implementation of the project will ensure the proper functioning of electricity networks in selected towns of Bocheń and Brest districts, extending the possibility of connecting new units of electricity generation from renewable sources in dispersal. In municipalities where the project is located, a significant increase in the number of RES installations producing electricity is expected. The project consists of 5 tasks of rebuilding the low...
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 11,989 bytes −2,456 Removed claim: summary (P836): The project will ensure the proper functioning of the electricity networks on the premises of the selected localities of the District of Bocheński and Brest and extends the possibility to connect new units of electricity generation from renewable sources in diffusion. In the municipalities where the project is located, there is an expected significant increase in the number of RES installations producing electricity. The project is made up of...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3711:37, 9 March 2020DG Regio talk contribs 13,156 bytes +2,456 Created claim: summary (P836): The project will ensure the proper functioning of the electricity networks on the premises of the selected localities of the District of Bocheński and Brest and extends the possibility to connect new units of electricity generation from renewable sources in diffusion. In the municipalities where the project is located, there is an expected significant increase in the number of RES installations producing electricity. The project is made up of 5...

24 February 2020

18 February 2020

31 January 2020

14 January 2020