Revision history of "Construction and modernisation of the power grid with voltage SN and nN enabling connection of electricity generation units from RES in the districts of Dąbrowa and Tarnów" (Q112100)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1516:15, 10 October 2024DG Regio talk contribs 88,998 bytes −35 Changed label, description and/or aliases in pt
  • curprev 16:1516:15, 10 October 2024DG Regio talk contribs 89,033 bytes +11 Set a claim value: summary (P836): O objetivo do projeto é modernizar as infraestruturas energéticas inadequadas em distritos selecionados de Dąbrowski e Tarnów para os encargos previstos. A modernização consistirá na substituição dos troços aéreos do SN de média tensão e na construção e modernização dos troços aéreos e por cabo da rede de baixa NN por novos troços com secções transversais aumentadas, bem como na substituição de uma parte da infraestrutura associada, tais como: poste...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3319:33, 2 March 2023DG Regio talk contribs 85,487 bytes +415 Changed label, description and/or aliases in da, it, sk, fi, sv, el, cs, fr, et, bg, ga, de, es, lv, lt, pt, ro, hu, hr, sl, nl, mt, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:3912:39, 27 July 2022DG Regio talk contribs 81,344 bytes +52,713 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5219:52, 1 December 2021DG Regio talk contribs 16,933 bytes +2,806 Created claim: summary (P836): L’objet du projet est de moderniser les infrastructures énergétiques non adaptées dans certaines localités des districts de Dąbrowski et de Tarnów afin de répondre aux charges prévues. La modernisation consistera en le remplacement des tronçons du réseau aérien moyenne tension du SN, ainsi que par la construction et la modernisation des tronçons aériens et câbles du réseau low-nN par de nouvelles sections avec des sections transversales accrues,...
  • curprev 19:5219:52, 1 December 2021DG Regio talk contribs 14,127 bytes +279 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,289 bytes +235 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,054 bytes −248 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 14,302 bytes +2,523 Created claim: summary (P836): The object of the project is to modernise the unsuitable energy infrastructure in selected districts of Dąbrowski and Tarnów to the planned burdens. The modernisation will consist of the replacement of the overhead sections of the medium-voltage SN, and the construction and modernisation of the overhead and cable sections of the low nN network with new ones with increased cross-sections, as well as the replacement of a part of the associated inf...
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 11,779 bytes −2,037 Removed claim: summary (P836): The aim of the project is to modernise the energy infrastructure that has not been used in the selected localities of the district of oak and Tarnów with the planned burdens. The upgrade will consist of the exchange of sections of the average overhead air network of the SN, and the construction and upgrading of low NN overhead and low NN sections and the replacement of part of the associated infrastructure, such as: poles, transformer stations...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3711:37, 9 March 2020DG Regio talk contribs 12,539 bytes +2,037 Created claim: summary (P836): The aim of the project is to modernise the energy infrastructure that has not been used in the selected localities of the district of oak and Tarnów with the planned burdens. The upgrade will consist of the exchange of sections of the average overhead air network of the SN, and the construction and upgrading of low NN overhead and low NN sections and the replacement of part of the associated infrastructure, such as: poles, transformer stations,...

24 February 2020

18 February 2020

31 January 2020

14 January 2020