Revision history of "Comprehensive preparation of investment areas of the Economic Activity Zone – Nowa Huta of the Future" (Q111678)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1516:15, 10 October 2024DG Regio talk contribs 82,856 bytes 0 Changed label, description and/or aliases in pt
  • curprev 16:1516:15, 10 October 2024DG Regio talk contribs 82,856 bytes −11 Set a claim value: summary (P836): O projecto tem por objecto a construção de infra-estruturas rodoviárias e de rede para o funcionamento da zona de actividade económica.A área total de 39 298 ha SAG.A área está dividida em três subáreas independentes: Subárea de Igołomska Norte, Subárea de Igołomsk Sul, Subárea de Igołomsk Oeste. Ordenar a vegetação existente necessária para o corte de madeira, arranque, detritos2. Desmantelamento de instalações e infraestruturas em conflito:3. Traz...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3219:32, 2 March 2023DG Regio talk contribs 81,972 bytes −191 Changed label, description and/or aliases in da, sk, lv, hr, ro, ga, cs, sv, et, mt, fi, el, de, bg, fr, lt, es, pt, hu, sl, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:3412:34, 27 July 2022DG Regio talk contribs 80,065 bytes +51,988 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 12:2012:20, 1 December 2021DG Regio talk contribs 16,763 bytes +2,795 Created claim: summary (P836): L’objet du projet est la construction d’infrastructures routières et de réseau pour le fonctionnement de la zone d’activité économique. La superficie totale de SAG 39,298 ha. La zone est divisée en trois indépendants podobszary:Podobszar Igołomska Nord, Igołomska Południe sous-zone, Igołomska Ouest sous-zone.Le champ d’application matériel ci-après sera mis en œuvre dans le cadre du projet:1. Commander la verdure existante abattage nécessaire de...
  • curprev 12:2012:20, 1 December 2021DG Regio talk contribs 13,968 bytes +179 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:1812:18, 20 October 2020DG Regio talk contribs 14,230 bytes +165 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:1812:18, 20 October 2020DG Regio talk contribs 14,065 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:1812:18, 20 October 2020DG Regio talk contribs 14,225 bytes +2,580 Created claim: summary (P836): The subject of the project is the construction of road and network infrastructure for the functioning of the Economic Activity Zone.The total area of SAG 39.298 ha.The area is divided into three independent sub-areas: Igołomska North Subarea, Igołomsk Sub-area South, Igołomsk Subarea West.The following material scope will be implemented within the project:1. Ordering the existing greenery necessary for woodcutting, grubbing-up, debris2. Decommis...
  • curprev 12:1812:18, 20 October 2020DG Regio talk contribs 11,645 bytes −2,046 Removed claim: summary (P836): The project involves the construction of road and network infrastructure for the operation of the Economic Activity Zone. the total area of the EAZ 39.298 ha.Teren is divided into three independent sub-areas: the North Igołomska sub-area, the South Igołomska sub-area, the Iastomska Igołomska area. the project will be carried out in the following material scope: 1. Cleaning of the existing greenery necessary for felling of trees, grubbing, depl...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3411:34, 9 March 2020DG Regio talk contribs 12,406 bytes +2,046 Created claim: summary (P836): The project involves the construction of road and network infrastructure for the operation of the Economic Activity Zone. the total area of the EAZ 39.298 ha.Teren is divided into three independent sub-areas: the North Igołomska sub-area, the South Igołomska sub-area, the Iastomska Igołomska area. the project will be carried out in the following material scope: 1. Cleaning of the existing greenery necessary for felling of trees, grubbing, deplet...

24 February 2020

18 February 2020

31 January 2020

14 January 2020