Revision history of "Establishment and expansion of Economic Activity Zones (SAG) together with appropriate infrastructure in Wieliczka commune" (Q111677)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:2115:21, 7 October 2024DG Regio talk contribs 90,807 bytes +12 Changed label, description and/or aliases in pt
  • curprev 15:2115:21, 7 October 2024DG Regio talk contribs 90,795 bytes −26 Set a claim value: summary (P836): O investimento executado no modo de conceção e construção consiste em: 1.ocupados 16 826 ha da parcela n.o 836 1, um. Wieliczka, o perímetro: Węgrzce Wielkie 0028 na parte definida na MPZP como áreas 11UP1, 12UP com divisão em zonas funcionais e de comunicação individuais de acordo com a MPZP através, nomeadamente: limpeza e aprofundamento de valas de drenagem existentes aprox. 684 m e cursos de água aprox. 188 m reconstrução de valas de drenagem ap...

12 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3219:32, 2 March 2023DG Regio talk contribs 88,424 bytes +3,650 Changed label, description and/or aliases in da, sk, es, lv, ga, el, fr, sl, fi, sv, et, de, pt, ro, lt, bg, hu, nl, cs, mt, hr, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:1615:16, 2 July 2022DG Regio talk contribs 82,661 bytes +52,717 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 12:2012:20, 1 December 2021DG Regio talk contribs 17,483 bytes +3,152 Created claim: summary (P836): L’investissement mis en œuvre dans le mode de conception et de construction consiste en: 1.Établissement de 16,826 ha de terrain no 836 1, un. Wieliczka, région: Grande Hongrie 0028 dans la partie définie dans MPC comme 11UP1, 12UP avec division en zones fonctionnelles et de communication individuelles selon MPC par, entre autres: purification et approfondissement des fossés de drainage existants env. 684 m et cours d’eau env. 188 m reconstructi...
  • curprev 12:2012:20, 1 December 2021DG Regio talk contribs 14,331 bytes +193 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:1812:18, 20 October 2020DG Regio talk contribs 14,579 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:1812:18, 20 October 2020DG Regio talk contribs 14,395 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:1812:18, 20 October 2020DG Regio talk contribs 14,577 bytes +2,808 Created claim: summary (P836): The investment implemented in the design and build mode consists of: 1.occupied 16.826 ha of plot no. 836 1, one. Wieliczka, the perimeter: Węgrzce Wielkie 0028 in the part defined in the MPZP as areas 11UP1, 12UP with division into individual functional and communication zones according to the MPZP through inter alia: cleansing and deepening existing drainage ditches approx. 684 m and watercourses approx. 188 m reconstruction of drainage ditche...
  • curprev 12:1812:18, 20 October 2020DG Regio talk contribs 11,769 bytes −2,354 Removed claim: summary (P836): The investment in design and explorer mode consists of: 1.16,826 hectares of land plot No 836 1, monohydrate. Wieliczka, rim: Wegzzyce Wielkie 0028 in the 11UP1 part defined in mpzp as UP, 12UP, with a breakdown by functional and communication zone in accordance with a combination of inter alia: cleaning up and deepening existing drainage ditches around 684 m and watercourses. 188 m conversion of drainage ditches approx. 975 m, removal of drai...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3411:34, 9 March 2020DG Regio talk contribs 12,844 bytes +2,354 Created claim: summary (P836): The investment in design and explorer mode consists of: 1.16,826 hectares of land plot No 836 1, monohydrate. Wieliczka, rim: Wegzzyce Wielkie 0028 in the 11UP1 part defined in mpzp as UP, 12UP, with a breakdown by functional and communication zone in accordance with a combination of inter alia: cleaning up and deepening existing drainage ditches around 684 m and watercourses. 188 m conversion of drainage ditches approx. 975 m, removal of draina...

24 February 2020

18 February 2020

31 January 2020

14 January 2020