Revision history of "Purchase of design services in the scope of the design of the sliding gate with improved performance, driving, endurance and durability at Kurek Szymon “Kurek”" (Q111563)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:2115:21, 7 October 2024DG Regio talk contribs 75,907 bytes −18 Changed label, description and/or aliases in pt
  • curprev 15:2115:21, 7 October 2024DG Regio talk contribs 75,925 bytes −175 Set a claim value: summary (P836): A realização do projeto é o resultado dos planos de desenvolvimento da Kurek, que pressupõem a necessidade de diversificar as fontes de receitas da empresa em resultado da implementação de novos produtos inovadores.Uma análise das necessidades dos beneficiários-alvo revelou que a oferta de produtos da empresa não contém portas de acesso deslizantes caracterizadas por uma cargabilidade e durabilidade adequadas da construção exigidas pelos clientes.A...

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3219:32, 2 March 2023DG Regio talk contribs 73,705 bytes +166 Changed label, description and/or aliases in it, sk, lv, da, et, fi, bg, sl, fr, hu, ga, cs, hr, ro, pt, es, el, nl, sv, lt, de, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:1315:13, 2 July 2022DG Regio talk contribs 71,414 bytes +45,394 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 12:2412:24, 1 December 2021DG Regio talk contribs 16,019 bytes +2,374 Created claim: summary (P836): La mise en œuvre du projet est le résultat des plans de développement de Kurek, qui supposent la nécessité de diversifier les sources de revenus de l’entreprise grâce à la mise en œuvre de nouveaux produits innovants.L’analyse des besoins signalés par les clients cibles a montré que l’offre de produits de l’entreprise n’inclut pas les portes d’entrée coulissantes caractérisées par une capacité de charge et une durabilité adéquates, requises par...
  • curprev 12:2412:24, 1 December 2021DG Regio talk contribs 13,645 bytes +231 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:4711:47, 20 October 2020DG Regio talk contribs 13,855 bytes +225 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4711:47, 20 October 2020DG Regio talk contribs 13,630 bytes −198 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4711:47, 20 October 2020DG Regio talk contribs 13,828 bytes +2,266 Created claim: summary (P836): The realisation of the project is the result of development plans of Kurek, which assume the need to diversify sources of revenues of the company as a result of the implementation of further innovative products.An analysis of the needs of the target recipients showed that the product offer of the company does not contain sliding gateway gateways characterised by adequate loadability and durability of the construction required by customers.In ord...
  • curprev 11:4711:47, 20 October 2020DG Regio talk contribs 11,562 bytes −1,601 Removed claim: summary (P836): Project implementation is the result of Kurek’s development plans that require the diversification of the company’s revenue streams as a result of the deployment of further innovative products.The analysis of the needs reported by the target audience has shown that the product offer of the firm does not include the sliding gates of entry which are characterised by the adequate superstructure and durability of the structure, as required by the...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3211:32, 9 March 2020DG Regio talk contribs 11,869 bytes +1,601 Created claim: summary (P836): Project implementation is the result of Kurek’s development plans that require the diversification of the company’s revenue streams as a result of the deployment of further innovative products.The analysis of the needs reported by the target audience has shown that the product offer of the firm does not include the sliding gates of entry which are characterised by the adequate superstructure and durability of the structure, as required by the cu...

24 February 2020

18 February 2020

31 January 2020

14 January 2020