Revision history of "Investment in the technology process modelling laboratory to increase the potential of CERTECH’s R & D activity, focused on developing, producing and introducing new products and processes." (Q111304)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3119:31, 2 March 2023DG Regio talk contribs 89,826 bytes +1,743 Changed label, description and/or aliases in it, da, sk, hr, fr, lv, fi, nl, ga, et, pt, el, sl, ro, lt, cs, sv, bg, es, de, hu, mt, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 15:0815:08, 2 July 2022DG Regio talk contribs 85,968 bytes +55,309 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 11:1411:14, 1 December 2021DG Regio talk contribs 17,733 bytes +3,053 Created claim: summary (P836): L’objectif du projet est de développer les conditions d’infrastructure pour l’activité du BR de la requérante, en vue de créer et d’introduire de nouveaux groupes de produits dédiés au marché zoologique et à l’élevage, au marché chimique ou cosmétique, à l’industrie et à la construction. L’objectif du projet est de créer un laboratoire de modélisation de produits et de procédés technologiques. L’investissement dans les équipements de recherche s...
  • curprev 11:1411:14, 1 December 2021DG Regio talk contribs 14,680 bytes +323 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:2411:24, 20 October 2020DG Regio talk contribs 14,798 bytes +253 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2411:24, 20 October 2020DG Regio talk contribs 14,545 bytes −207 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2411:24, 20 October 2020DG Regio talk contribs 14,752 bytes +2,704 Created claim: summary (P836): The aim of the project is to develop infrastructure conditions for the activity of the applicant, aimed at the creation and introduction of new product groups dedicated to the zoological market and animal husbandry, chemical or cosmetic market, industry and construction. The aim of the project is to create a modelling laboratory for products and technological processes.Investing in a project-specific research equipment will allow to examine the...
  • curprev 11:2411:24, 20 October 2020DG Regio talk contribs 12,048 bytes −2,194 Removed claim: summary (P836): The aim of the project is to develop infrastructure conditions for the business of BR Applicant, to develop and introduce new product groups, which are dedicated to the zoo and animal husbandry, to the chemical or cosmetics markets, and to industry and construction. The aim of the project is to provide a laboratory for modelling products and technologyes.Investment in the research equipment project will allow to examine the quality of new prod...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3011:30, 9 March 2020DG Regio talk contribs 12,948 bytes +2,194 Created claim: summary (P836): The aim of the project is to develop infrastructure conditions for the business of BR Applicant, to develop and introduce new product groups, which are dedicated to the zoo and animal husbandry, to the chemical or cosmetics markets, and to industry and construction. The aim of the project is to provide a laboratory for modelling products and technologyes.Investment in the research equipment project will allow to examine the quality of new produc...

24 February 2020

18 February 2020

31 January 2020

14 January 2020