Revision history of "Tatras – an innovative training method based on automatic adaptation to individual needs trained by sensory assessment of the training engagement." (Q111248)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 92,022 bytes −22 Changed label, description and/or aliases in pt
  • curprev 03:5903:59, 11 October 2024DG Regio talk contribs 92,044 bytes −38 Set a claim value: summary (P836): Como resultado do projecto, a metodologia Tatry e o software de ferramentas Organy serão atingidos nível IX TRL para formação na utilização de aplicações empresariais. Atualmente, esta é realizada sob a forma de formação em grupo apoiada por instruções postais e assistência de outros funcionários, o que tem muitos inconvenientes: absorve os recursos das infraestruturas, afasta os trabalhadores do trabalho e exige o desenvolvimento de materiais. O pr...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3119:31, 2 March 2023DG Regio talk contribs 89,685 bytes +326 Changed label, description and/or aliases in lv, it, da, sk, cs, pt, fr, et, fi, sl, sv, el, ro, hr, lt, ga, de, mt, nl, es, bg, hu, and other parts

25 October 2022

20 October 2022

27 July 2022

  • curprev 12:2612:26, 27 July 2022DG Regio talk contribs 87,247 bytes +56,447 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 11:1311:13, 1 December 2021DG Regio talk contribs 17,644 bytes +3,175 Created claim: summary (P836): Grâce au projet, la méthodologie Tatras et le logiciel Organy seront atteints du niveau IX TRL pour la formation à l’utilisation d’applications commerciales. À l’heure actuelle, cela se fait sous la forme d’une formation de groupe soutenue par des instructions d’emploi et l’aide d’autres membres du personnel, ce qui présente de nombreux inconvénients: absorbe les ressources de l’infrastructure, distraire les travailleurs du travail, nécessite la...
  • curprev 11:1311:13, 1 December 2021DG Regio talk contribs 14,469 bytes +268 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 11:1311:13, 20 October 2020DG Regio talk contribs 14,642 bytes +210 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:1311:13, 20 October 2020DG Regio talk contribs 14,432 bytes −204 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:1311:13, 20 October 2020DG Regio talk contribs 14,636 bytes +2,694 Created claim: summary (P836): As a result of the project, the Tatry methodology and the tool software Organy will be reached IX level TRL for training in the use of business applications. Currently, this is carried out in the form of group training supported by post instructions and assistance of other employees, which has many drawbacks: it absorbs infrastructure resources, takes employees away from work, requires materials to be developed. The project product will respond...
  • curprev 11:1311:13, 20 October 2020DG Regio talk contribs 11,942 bytes −2,166 Removed claim: summary (P836): As a result of the project, the Tatry methodology and tool software will be developed. This is currently done in the form of group training, supported by instruction instructions and assistance from other employees, which has many drawbacks: the infrastructure absorption capacity of the workers is absorbed, and materials are required to be developed. The project product will respond to these problems will allow the self-adaptive delivery of th...

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:2811:28, 9 March 2020DG Regio talk contribs 12,822 bytes +2,166 Created claim: summary (P836): As a result of the project, the Tatry methodology and tool software will be developed. This is currently done in the form of group training, supported by instruction instructions and assistance from other employees, which has many drawbacks: the infrastructure absorption capacity of the workers is absorbed, and materials are required to be developed. The project product will respond to these problems will allow the self-adaptive delivery of the...

24 February 2020

18 February 2020

31 January 2020

14 January 2020