Revision history of "A better start for energy and computer science – development of professional competences of students of the Jerzy Siwiński County High School Complex in Legionów." (Q110976)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0618:06, 9 October 2024DG Regio talk contribs 90,236 bytes +3 Changed label, description and/or aliases in pt
  • curprev 18:0618:06, 9 October 2024DG Regio talk contribs 90,233 bytes +173 Set a claim value: summary (P836): O projeto será executado durante 16 meses, ou seja, de 1 de setembro de 2016 a 31 de dezembro de 2017 (k.d.1) no Complexo Escolar Secundário do Condado de Jerzy Siwiński, em Legionów. O projeto foi elaborado com base na aprovação do principal organismo, ou seja, o diagnóstico do Condado de Legionów das necessidades do PZSP em Legionów (k.d.4) O objetivo do projeto resulta diretamente dos problemas diagnosticados no âmbito do RPO WM, bem como das dif...

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3119:31, 2 March 2023DG Regio talk contribs 87,663 bytes −2,236 Changed label, description and/or aliases in da, it, sk, et, ga, cs, fr, sv, lv, lt, hr, el, es, ro, de, bg, hu, fi, pt, nl, sl, mt, and other parts

25 October 2022

24 October 2022

27 July 2022

  • curprev 12:1712:17, 27 July 2022DG Regio talk contribs 87,786 bytes +56,758 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:3719:37, 1 December 2021DG Regio talk contribs 17,810 bytes +3,204 Created claim: summary (P836): Le projet sera mis en œuvre pendant 16 mois, c’est-à-dire janvier septembre 2016 jusqu’au 31.12.2017 (k.d.1) au complexe de district des écoles secondaires secondaires Jerzy Siwiński à Legionowo. Le projet a été élaboré sur la base de l’approbation de l’autorité dirigeante, à savoir. Le diagnostic par le district de Legionowski des besoins du PZSP à Legionów (k.d.4) Le principal objectif du projet découle directement des problèmes diagnostiqués...
  • curprev 19:3719:37, 1 December 2021DG Regio talk contribs 14,606 bytes +259 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

20 October 2020

  • curprev 10:3310:33, 20 October 2020DG Regio talk contribs 14,794 bytes +228 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3310:33, 20 October 2020DG Regio talk contribs 14,566 bytes −254 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3310:33, 20 October 2020DG Regio talk contribs 14,820 bytes +2,791 Created claim: summary (P836): The project will be implemented for 16 months, i.e.01.09.2016 to 31.12.2017 (k.d.1) in the Jerzy Siwiński County High School Complex in Legionów.The project was prepared on the basis of the approval of the leading body, i.e. Legionów County diagnosis of needs of PZSP in Legionów (k.d.4) The goal of the project results directly from the problems diagnosed as part of the RPO WM, as well as difficulties occurring in PZSP and on the local labour mar...
  • curprev 10:3310:33, 20 October 2020DG Regio talk contribs 12,029 bytes −2,283 Removed claim: summary (P836): The project will run for 16 months tj.01.09.2016 to 31.12.2017 (K.d.1.) in the district assembly of the Jerzy Sitwiński School in Legionella. the project has been drawn up on the basis of the approved body: The district of legionowski District in legionowski’s needs in Legionowo (K.d.4) The objective is to derive directly from the problems diagnosed in the ROP MP, as well as the difficulties encountered in the PZSP and in the local labour mark...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:2411:24, 9 March 2020DG Regio talk contribs 13,029 bytes +2,283 Created claim: summary (P836): The project will run for 16 months tj.01.09.2016 to 31.12.2017 (K.d.1.) in the district assembly of the Jerzy Sitwiński School in Legionella. the project has been drawn up on the basis of the approved body: The district of legionowski District in legionowski’s needs in Legionowo (K.d.4) The objective is to derive directly from the problems diagnosed in the ROP MP, as well as the difficulties encountered in the PZSP and in the local labour market...

24 February 2020

18 February 2020

31 January 2020

14 January 2020