Revision history of "Active kindergarten in Stupsk" (Q110831)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:5316:53, 2 March 2023DG Regio talk contribs 81,909 bytes −6,539 Changed label, description and/or aliases in lv, it, da, sk, sl, fi, et, de, ro, hu, pt, fr, lt, mt, sv, el, cs, ga, hr, bg, es, and other parts

25 October 2022

24 October 2022

2 July 2022

  • curprev 14:5914:59, 2 July 2022DG Regio talk contribs 86,325 bytes +56,405 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 12:2212:22, 1 December 2021DG Regio talk contribs 17,499 bytes +3,163 Created claim: summary (P836): Il est prévu de mettre en œuvre un projet au PO du SP à Stupsk, Morawa et Wyszyna Kościelny, en cercle. 01.09.2018-30.09.2019 (full.kryt.dostnr1), org. prow. est la municipalité de Stupsk. La période de fonctionnement de chaque centre de l’OLP depuis le 01.09.2016. (full.kryt.dost.nr.2).Le problème est le manque de connaissance des locaux d’habitation, les problèmes des familles financières, donc la plupart. dz. ne se rend pas au front. (dans l’...
  • curprev 12:2212:22, 1 December 2021DG Regio talk contribs 14,336 bytes +119 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:3010:30, 20 October 2020DG Regio talk contribs 14,658 bytes +90 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3010:30, 20 October 2020DG Regio talk contribs 14,568 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3010:30, 20 October 2020DG Regio talk contribs 14,663 bytes +2,970 Created claim: summary (P836): It is planned to implement the project in the OP at the SP in Stupsk, Moravia and Wyszyna Kościelnych, in around. 01.09.2018-30.09.2019 (f.kryt.dostnr1), org. prow. is Stupsk Municipality. Functional period of each PLO centre from 01.09.2016r. (f.kryt.dost.nr2).In the building, the problem is unaware. the inn. about a third. pre-glass, problems of the finan. families, therefore the majority. dz. does not attend the front. (in a year of glass. On...
  • curprev 10:3010:30, 20 October 2020DG Regio talk contribs 11,693 bytes −2,229 Removed claim: summary (P836): A project is planned to be implemented in the PO at SP in Stupsk, Morales and Ecclesiastical Affairs, in okr. 01.09.2018-30.09.2019 (costab.no.1), org. propos. is the municipality of Stupsk. The period of operation of each centre of the PLO since 01.09.2016 (unsuccessful. (2)).In the context of the problem, there is a lack of awareness of the problem. (in the year SZK. 2016/2017 Pre-glass covers only 40 children — K 19, M21) from diagnosis of...

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4611:46, 9 March 2020DG Regio talk contribs 12,628 bytes +2,229 Created claim: summary (P836): A project is planned to be implemented in the PO at SP in Stupsk, Morales and Ecclesiastical Affairs, in okr. 01.09.2018-30.09.2019 (costab.no.1), org. propos. is the municipality of Stupsk. The period of operation of each centre of the PLO since 01.09.2016 (unsuccessful. (2)).In the context of the problem, there is a lack of awareness of the problem. (in the year SZK. 2016/2017 Pre-glass covers only 40 children — K 19, M21) from diagnosis of ne...

24 February 2020

18 February 2020

31 January 2020

14 January 2020