Revision history of "Introduction of production of large non-flammable composite parts" (Q11024)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

11 June 2023

17 February 2023

2 July 2022

  • curprev 14:4714:47, 2 July 2022DG Regio talk contribs 49,693 bytes +28,561 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 08:0808:08, 2 December 2021DG Regio talk contribs 16,501 bytes +1,392 Created claim: summary (P836): Das Projekt besteht in der Einführung der Produktion von großen Verbundteilen für Fahrzeuge in 5M, die die Anforderungen an den Brandwiderstand R1 HL2 nach EN 45545 erfüllen. Das Projekt wird in einer Phase umgesetzt, in der mindestens 2 neue innovative Produkte umgesetzt werden – große Verbundteile für Fahrzeuge und 2 innovative Produktionsverfahren. Die notwendige Entwicklung wird im Rahmen des laufenden Ergebnisses des Projekts des Anwendungs...
  • curprev 08:0808:08, 2 December 2021DG Regio talk contribs 15,109 bytes +113 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 09:1409:14, 28 November 2021DG Regio talk contribs 14,996 bytes +1,486 Created claim: summary (P836): Le projet consiste à introduire la production de grandes pièces composites pour le matériel roulant dans 5M, qui répondent aux exigences relatives au degré de résistance au feu R1 HL2 conformément à la norme EN 45545. Le projet sera mis en œuvre en une phase, au cours de laquelle au moins 2 nouveaux produits innovants seront mis en œuvre: de grandes pièces composites pour le matériel roulant et deux procédés innovants pour la production. Le déve...
  • curprev 09:1409:14, 28 November 2021DG Regio talk contribs 13,510 bytes +116 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:3015:30, 22 October 2020DG Regio talk contribs 13,843 bytes +1,384 Created claim: summary (P836): The aim of the project is to introduce the production of large composite parts for rolling stock up to 5M, which meet the requirements for fire resistance R1 HL2 according to EN 45545. The project will be implemented in one stage in which at least 2 new innovative products will be implemented – large composite parts for rolling stock and 2 innovative processes for production. The necessary development is terminated within the continuous outcome...
  • curprev 15:3015:30, 22 October 2020DG Regio talk contribs 12,459 bytes −953 Removed claim: summary (P836): The project aims at introducing the production of large composite parts for rolling stock in 5M to meet the requirements of the degree of resistance to fire of R1 HL2 of EN 45545. The project will be implemented at one stage in which at least 2 new innovative products — large composite parts for rolling stock and 2 innovative production processes — are implemented. The necessary development is completed as part of the continuous outcome of the...
  • curprev 07:4607:46, 22 October 2020DG Regio talk contribs 13,412 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:4607:46, 22 October 2020DG Regio talk contribs 13,288 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

15 July 2020

6 June 2020

25 March 2020

26 February 2020

  • curprev 07:3507:35, 26 February 2020DG Regio talk contribs 12,119 bytes +953 Created claim: summary (P836): The project aims at introducing the production of large composite parts for rolling stock in 5M to meet the requirements of the degree of resistance to fire of R1 HL2 of EN 45545. The project will be implemented at one stage in which at least 2 new innovative products — large composite parts for rolling stock and 2 innovative production processes — are implemented. The necessary development is completed as part of the continuous outcome of the a...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020