Revision history of "Active family in Grodzisk Mazowiecki commune" (Q109648)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

20 October 2022

27 July 2022

  • curprev 12:0312:03, 27 July 2022DG Regio talk contribs 89,953 bytes +58,852 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:4010:40, 1 December 2021DG Regio talk contribs 18,425 bytes +3,091 Created claim: summary (P836): L’objectif principal du projet est la réintégration de la communauté de 30 personnes/membres de la famille à risque de tomber du territoire de la municipalité de Grodzisk Mazowiecki à jour. 31.12.2017 Les principaux objectifs seront mis en œuvre à travers les objectifs spécifiques du projet — réintégration sociale 30 UP jusqu’au 31.12.2017 — réinsertion professionnelle 30 UP jusqu’au 31.12.2017 — intégration de 30 familles à risque d’être scolar...
  • curprev 10:4010:40, 1 December 2021DG Regio talk contribs 15,334 bytes +118 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:4410:44, 20 October 2020DG Regio talk contribs 15,657 bytes +105 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:4410:44, 20 October 2020DG Regio talk contribs 15,552 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:4410:44, 20 October 2020DG Regio talk contribs 15,660 bytes +2,971 Created claim: summary (P836): The main objective of the project is to reintegrate the population in 30 people/members of families threatened to hatch from Grodzisk Mazowiecki commune to the bottom. 31.12.2017 The main objectives will be pursued through the specific objectives of the project – social reintegration of 30 UP to 31.12.2017 – vocational reintegration of 30 UP to 31.12.2017 -integration of 30 families at risk of social welfare by 31.12.2017 -improvement of the mat...
  • curprev 10:4410:44, 20 October 2020DG Regio talk contribs 12,689 bytes −2,439 Removed claim: summary (P836): The main purpose of the project is to reintegrate into 30 persons/members of the families at risk from the local municipality of Grodzisk Mazowiecki. 31.12.2017. the main objectives will be pursued through the specific objectives of the project — social reintegration of 30 UP to 31.12.2017 placements into 30 -reintegration 31.12.2017 UP into — integration of 30 families at risk to dn.31.12.2017 — improving the material situation of 30 families...

16 July 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:5309:53, 9 March 2020DG Regio talk contribs 13,402 bytes +2,439 Created claim: summary (P836): The main purpose of the project is to reintegrate into 30 persons/members of the families at risk from the local municipality of Grodzisk Mazowiecki. 31.12.2017. the main objectives will be pursued through the specific objectives of the project — social reintegration of 30 UP to 31.12.2017 placements into 30 -reintegration 31.12.2017 UP into — integration of 30 families at risk to dn.31.12.2017 — improving the material situation of 30 families t...

24 February 2020

18 February 2020

31 January 2020

14 January 2020