Revision history of "Improving communication, social and economic cohesion in the Cichanów subregion through the reconstruction of roads in the Płoń district connecting to the TEN-T network – reconstruction of district road No. 3030 W Wierzbica Szlachecka – Starczewo" (Q109451)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2719:27, 2 March 2023DG Regio talk contribs 91,551 bytes −130 Changed label, description and/or aliases in it, da, sk, fi, fr, sv, ga, el, lv, hu, pt, cs, et, bg, sl, es, hr, ro, lt, de, mt, nl, and other parts

25 October 2022

20 October 2022

27 July 2022

  • curprev 12:0212:02, 27 July 2022DG Regio talk contribs 90,010 bytes +57,652 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

3 December 2021

1 December 2021

  • curprev 10:1310:13, 1 December 2021DG Regio talk contribs 19,679 bytes +3,027 Created claim: summary (P836): L’objet du projet est la reconstruction de la route de district no 3030 W Wierzbica Szlachecka — Starczewo — Arcelin. sur la section du km 0+ 000 au km 12 + 713. Le champ d’application détaillé du projet comprend: reconstruction du revêtement routier existant de la route de district no 3030 W sur le tronçon allant du km 0+ 000 au km 10 + 209; B) la construction d’une chaussée à surface bitumineuse comprise entre les km 10+ 209 et 12 + 713 c) la...
  • curprev 10:1310:13, 1 December 2021DG Regio talk contribs 16,652 bytes +357 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:2210:22, 20 October 2020DG Regio talk contribs 16,736 bytes +330 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:2210:22, 20 October 2020DG Regio talk contribs 16,406 bytes −299 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:2210:22, 20 October 2020DG Regio talk contribs 16,705 bytes +2,792 Created claim: summary (P836): The subject of the project is the reconstruction of district road No. 3030 W Wierzbica Szlachecka – Starczewo – Arcelin. on the section from km 0 + 000 to km 12+ 713. The specific scope of the project includes: a) Reconstruction of the existing road pavement of district road No. 3030 W on the section from km 0 + 000 to km 10 + 209; B) construction of a road with bituminous pavement on the section from km 10 + 209 to km 12 + 713 c) the constructi...
  • curprev 10:2210:22, 20 October 2020DG Regio talk contribs 13,913 bytes −2,362 Removed claim: summary (P836): The project relates to the reconstruction of the district road No 3030 in Wierzbica — Starczewo — Arcelor on the section from km 0 + 000 to km 12 + 713. The detailed scope of the project includes: (a) upgrading of the existing road pavement of the district road No 3030W from km 0 + 000 to km 10 + 209; construction of a carriageway with bituminous pavement on the section from km 10 + 209 to km 12 + 713 c) the construction of new pedestrian line...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:5609:56, 9 March 2020DG Regio talk contribs 14,147 bytes +2,362 Created claim: summary (P836): The project relates to the reconstruction of the district road No 3030 in Wierzbica — Starczewo — Arcelor on the section from km 0 + 000 to km 12 + 713. The detailed scope of the project includes: (a) upgrading of the existing road pavement of the district road No 3030W from km 0 + 000 to km 10 + 209; construction of a carriageway with bituminous pavement on the section from km 10 + 209 to km 12 + 713 c) the construction of new pedestrian lines...

24 February 2020

18 February 2020

31 January 2020

14 January 2020