Revision history of "Communication of the city of Mława with the interchange node and transport corridors of the TEN-T network" (Q109439)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2719:27, 2 March 2023DG Regio talk contribs 86,915 bytes +415 Changed label, description and/or aliases in da, it, sk, es, et, de, cs, sv, lt, ga, fi, bg, lv, ro, nl, pt, hr, el, fr, sl, mt, hu, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 14:3114:31, 2 July 2022DG Regio talk contribs 84,830 bytes +53,848 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:1210:12, 1 December 2021DG Regio talk contribs 18,378 bytes +3,128 Created claim: summary (P836): Il existe deux voies de communication RTE-T à travers Mława: le rail E65 et la route DK7, mais en raison du manque d’infrastructures techniques adéquates, ne sont pas correctement reliés entre eux. Grâce à la mise en œuvre du projet, des infrastructures routières seront construites, qui seront liées à la construction prévue d’une nouvelle gare ferroviaire et routière intégrée dans le cadre d’un projet distinct à la place de l’arrêt de voyageurs...
  • curprev 10:1210:12, 1 December 2021DG Regio talk contribs 15,250 bytes +142 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,549 bytes +168 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,381 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,506 bytes +2,745 Created claim: summary (P836): There are two TEN-T routes across Mława: the railway E65 and the road DK7 are not adequately interconnected due to the lack of adequate technical infrastructure. Thanks to the implementation of the project, road infrastructure will be built, which will be linked to the planned construction of the new railway and bus station in place of the existing passenger stop. A 1.16 km long road built as part of the project, connecting ul. Kosciuszko from u...
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 12,761 bytes −2,399 Removed claim: summary (P836): Two TEN-T transport routes run by Mława: rail E65 and road DK7 but due to the lack of appropriate technical infrastructure, they are not linked to each other. As a result of the project, the road infrastructure will be built, which will be linked to the planned construction, as part of a separate project, of a new integrated rail/bus station in place of the existing passenger stop. Built as part of a 1.16 km project to connect ul. Kościuszki,...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:5609:56, 9 March 2020DG Regio talk contribs 13,444 bytes +2,399 Created claim: summary (P836): Two TEN-T transport routes run by Mława: rail E65 and road DK7 but due to the lack of appropriate technical infrastructure, they are not linked to each other. As a result of the project, the road infrastructure will be built, which will be linked to the planned construction, as part of a separate project, of a new integrated rail/bus station in place of the existing passenger stop. Built as part of a 1.16 km project to connect ul. Kościuszki, ul...

24 February 2020

18 February 2020

31 January 2020

14 January 2020