Revision history of "Reconstruction of district road No. 3759 in Szumanie-Bielsk for a length of 2.278 km" (Q109438)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1118:11, 9 October 2024DG Regio talk contribs 85,793 bytes +4 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 9 October 2024DG Regio talk contribs 85,789 bytes −39 Set a claim value: summary (P836): O objetivo global do projeto, em consonância com o objetivo da ação 7.1 PRO WM, é melhorar a coerência da rede rodoviária regional com a rede RTE-T e aumentar a acessibilidade interna e externa. Além disso, a execução do projeto melhorará a mobilidade local nos domínios social e económico, reduzirá as elevadas emissões sonoras, melhorará a qualidade do ar ambiente, melhorará a acessibilidade às paragens dos transportes públicos e assegurará a dispon...

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2719:27, 2 March 2023DG Regio talk contribs 83,070 bytes +585 Changed label, description and/or aliases in fr, it, lv, da, ro, es, el, sk, fi, sv, et, cs, hu, pt, sl, ga, lt, hr, de, mt, bg, nl, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 14:3114:31, 2 July 2022DG Regio talk contribs 80,821 bytes +51,558 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:1210:12, 1 December 2021DG Regio talk contribs 17,749 bytes +2,836 Created claim: summary (P836): L’objectif général du projet, conformément à l’objectif de la mesure 7.1 du PRO WM, est d’améliorer la cohérence du réseau routier régional avec le réseau RTE-T et d’accroître l’accessibilité interne et externe. En outre, la mise en œuvre du projet permettra d’améliorer la mobilité sociale et économique locale, de réduire les émissions sonores élevées, d’améliorer la qualité de l’air, d’améliorer l’accessibilité aux arrêts des transports publics...
  • curprev 10:1210:12, 1 December 2021DG Regio talk contribs 14,913 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,201 bytes +145 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,056 bytes −145 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,201 bytes +2,572 Created claim: summary (P836): The overarching objective of the project, in line with the objective of Action 7.1 PRO WM, is to improve the coherence of the regional road network with the TEN-T network and to increase internal and external accessibility. Moreover, the implementation of the project will improve local mobility in the social and economic spheres, reduce high noise emissions, improve the quality of ambient air, improve accessibility to public transport stops and...
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 12,629 bytes −2,226 Removed claim: summary (P836): The overall objective of the project, in line with the objective of Action 7.1 of the PRO WM, is to improve the coherence of the regional road network with the TEN-T network and to increase internal and external accessibility. In addition, the project will improve local mobility in the social and economic spheres, reduce high noise emissions, improve ambient air quality, improve accessibility to public transport stops and ensure the accessibil...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:5609:56, 9 March 2020DG Regio talk contribs 13,139 bytes +2,226 Created claim: summary (P836): The overall objective of the project, in line with the objective of Action 7.1 of the PRO WM, is to improve the coherence of the regional road network with the TEN-T network and to increase internal and external accessibility. In addition, the project will improve local mobility in the social and economic spheres, reduce high noise emissions, improve ambient air quality, improve accessibility to public transport stops and ensure the accessibilit...

24 February 2020

18 February 2020

31 January 2020

14 January 2020