Revision history of "Reducing emissions of air pollutants in Wieliszew Municipality by building “Park and Eat” car parks." (Q109162)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:1316:13, 10 October 2024DG Regio talk contribs 90,917 bytes +8 Changed label, description and/or aliases in pt
  • curprev 16:1316:13, 10 October 2024DG Regio talk contribs 90,909 bytes +95 Set a claim value: summary (P836): O principal objetivo do investimento é libertar o município de Wieliszew de um número excessivo de automóveis particulares e assumir o tráfego de residentes através de transportes públicos através da construção de dois parques de estacionamento P+R nos principais pontos de correspondência dos transportes públicos – na estação PKP de Wieliszew e na estação PKP de Michałów-Regionów. O projeto faz parte do eixo prioritário IV Transição para uma economi...

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2619:26, 2 March 2023DG Regio talk contribs 88,056 bytes +482 Changed label, description and/or aliases in da, it, lv, sk, fi, et, fr, ga, ro, es, el, de, hu, sv, bg, cs, mt, pt, sl, nl, lt, hr, and other parts

25 October 2022

19 October 2022

27 July 2022

  • curprev 12:0012:00, 27 July 2022DG Regio talk contribs 85,911 bytes +55,229 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 18,208 bytes +3,005 Created claim: summary (P836): L’objectif principal de l’investissement est de libérer la commune de Wieliszew du nombre excessif de voitures particulières et de reprendre le trafic des résidents par les transports publics grâce à la construction de deux parkings P+R aux principaux points de transfert des transports publics — à la gare de Wieliszew PKP et à la gare de Michałów-Région. Le projet est conforme aux hypothèses de transition de l’axe prioritaire IV vers une économi...
  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 15,203 bytes +203 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 09:3009:30, 20 October 2020DG Regio talk contribs 15,441 bytes +166 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:3009:30, 20 October 2020DG Regio talk contribs 15,275 bytes −158 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:3009:30, 20 October 2020DG Regio talk contribs 15,433 bytes +2,713 Created claim: summary (P836): The main purpose of the investment is to free the Municipality of Wieliszew from excessive number of private cars and to take over the traffic of residents by public transport by building two P+R car parks at the main interchange points of public transport – at the Wieliszew PKP station and at the Michałów-Regionów PKP station. The project is part of the Priority Axis IV Transition to a low carbon economy; Specific objective: Better air quality....
  • curprev 09:3009:30, 20 October 2020DG Regio talk contribs 12,720 bytes −2,268 Removed claim: summary (P836): The main purpose of the investment is to relieve the municipality of Wieliczka from excessive private cars and to take over the public transport traffic by means of the construction of two P + R parks at the main connecting points of public transport — at the stations of PKP Wielizew and at the PKP Małowy-Regions station. The project is part of the objective of a Priority IV transition to a low-carbon economy; Specific objective: Better air qu...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:4709:47, 9 March 2020DG Regio talk contribs 13,273 bytes +2,268 Created claim: summary (P836): The main purpose of the investment is to relieve the municipality of Wieliczka from excessive private cars and to take over the public transport traffic by means of the construction of two P + R parks at the main connecting points of public transport — at the stations of PKP Wielizew and at the PKP Małowy-Regions station. The project is part of the objective of a Priority IV transition to a low-carbon economy; Specific objective: Better air qual...

24 February 2020

18 February 2020

31 January 2020

14 January 2020